Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed.VR 1.01 <br /> Complete the following checklist: <br /> X Yes No' Is Etre audible alarm operational-9 <br /> X Yes No' Is the visual alarm operational? <br /> X Yes ❑ No' Were all sensors visual) ins ed,tunctional tested,and confrtmed o rational? <br /> X Yes ❑ No- Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper o enation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> X WA <br /> X Yes ❑ No` For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ❑ WA detects a leak,fails to operate,or is elechically disconnected? If yes:which sensors initiate positive shutdown? (Check all that apply) <br /> X Sumprrrench Sensors; X Dispenser Containment Sensors. Did you confine positive shutdown due to leaks and sensor <br /> failure/disconnection? X Yes; No. <br /> X Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning tlevice(i.e. no mechanical overfill prevention <br /> WA valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating property? If so,at what percent <br /> of tank capacity does the alarmtrigger? 95 % <br /> ❑ Yes' X No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes' X No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) Product; Water. If <br /> es describe causes in Section E,below. <br /> X Yes n No' Was monitorinq system set-up reviewed to ensure proper s?Attach set up reports,if applicable <br /> X Yes N No' Is all monitoring equipment operatioriMper manufacturers specifications? <br /> •In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> _8 OZ DIESEL WATER MIX FOUND IN THE UDC's AT DISP 9-10 AND 11-12 IT WAS REMOVED AND DISPOSED OF AT THE <br /> SITE. <br /> Monitoring System Certification Page 2 of 4 12/07 <br /> 2 2/21/07 <br />