Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: X Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the foilowirrg_checklist <br /> Yes - No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Eyes <br /> No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> _: No* Was accuracy of system product level readings tested? <br /> Ei No` Was accuracy of system water level readings tested? <br /> No- Were all probes reinstalled properly? <br /> Yes No- re all items on the equipment manufacturers maintenance checklist completed? <br /> `In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): C Check this box if LLDs are not installed. <br /> Com the following checklist: <br /> X Yes _ No` For equipment start-up or annual equipment certfication,was a leak simulated to verify LLD performance?(Check all <br /> WA thatapply) Simulated leak rate: 3 g.p.h.; 0.1 g.p.h; 0.2 g.p.h. <br /> X Yes No` Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes No' Was the testing apparatus properly calibrated? <br /> -1 Yes No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> X WA <br /> Yes _-. No` For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> X WA <br /> 17 Yes No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> X N/A I disconnected? <br /> - Yes - No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system maffunctions or <br /> X WA fails a test? <br /> X Yes No` For electronic LLDs,have all accessible wiring wnnections been visually inspected? <br /> 6 WA <br /> X Yes 71 No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> •In the Section H,below,describe how and when theseese deficiencies were or will bbe <br /> e corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of d 12107 <br /> J 2/21/07 <br />