My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:27:18 PM
Creation date
11/8/2018 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI CHEVRON
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1916\PR0527728\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
9/28/2017 8:32:42 PM
QuestysRecordID
3652760
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br /> Solovare Version Installed: <br /> Com tete the follmwin checklist: <br /> Ycs ❑ No• Is the audible at:=n ertional? <br /> Ycs ❑ No• Is the visual alarm o •rational' <br /> Yes <br /> ❑ No• W'cre all sensors cisualb inspected,funcimnalb tested.and cool firmed operational <br /> Yes 7 No- Were all sensors installed at lowest point of secondary containment and positioned in that other equipment will <br /> not interfere with thea proper o wrationi! <br /> J 7 Yes O No* If alarms an: relayed m a remote monitoring station, is all communications equipment (e.g. modem) <br /> JAS N/A operational° <br /> Ycs O No For pressumed piping systems. does the turbine automatically shut down if the piping secondary containment <br /> O N/A monitoring system detects a leak. fails in operate.or is electrically disconnected'! If yes: which sensors initiate <br /> ,i positive shut-down? (Check all that applo A Sump/Trench Senwrs: 2,FDispenscr yCyontainment Sensors. <br /> i, Did you confirm positive shut-down due to leaks and sensor failure/diseonneciion?.q Yes. CINa. <br /> Yes O No- For tank systems that utilize the monitoring system as the primary tank overfill w•ammg device (u.c. no <br /> ❑ N/A mechanical overfill prevention valve is installed). is the overfill warning alarm visible and audrhle a the tank ' <br /> rill rmi(s)and operating ro •rlv? If sit at what percent of tank capacity does the alarm trigger? <br /> ❑ Yes` No Was any monitoring equipment replaced') If yes. tdnuifq specific sensors. probes.or other equipment replaced <br /> and list the manufacturer name and model for all replacement arts in Section E.below. <br /> O Yes* No Was liquid found inside any secondary containment systems designed as dry systems! (Check all that app/v)O <br /> Produce J Water. If ves.describe causes in Section F.below. <br /> O Yes No' Was monitorings stem set-u reviewed to ensure proper settings'!Attach set a reports.if a I"able <br /> ❑ Yes )iY No" Is all monitoring equipment n erational per manufacturer's s •edieations? <br /> • In Section F.below.describe how-and w hen these deficiencies were or will he corrected. <br /> F. Comments: <br /> Pani'_of 3 nllot <br />
The URL can be used to link to this page
Your browser does not support the video tag.