My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:27:18 PM
Creation date
11/8/2018 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI CHEVRON
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1916\PR0527728\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
9/28/2017 8:32:42 PM
QuestysRecordID
3652760
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. Note <br /> F. In-Tank Gauging/SIR Equipment: ] Check itis box if aak ganging is used only for inventory control. <br /> ZI Check this box if no tank gauging or SIR equipment is installed. <br /> This section must he completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the rollow'in•checklist: <br /> Yes ] No- Has all input wiring been inspected for proper entry and terminalion.including testing for ground faults? <br /> )0 Yes ] No- Were all tank gauging probes visually inspected for damage and rcstdue buildup' <br /> JS Yes ❑ No- Was accuracy of system product level readings tested? <br /> Yes ❑ No' Was accnocy,of system water level readings tested? <br /> Jg Yes ❑ Na- Wcre all probes reinstalled properly! <br /> Yes ❑ No* Were all nems on the equipment manufacturer s maimemnce eheckhsi completed' <br /> • In the Section It.below.describe hum and when these deficiencies were or will be corrected. <br /> C. Line Leak Detectors(LI.D): U Check this box if LLDs are ant installed- <br /> Complete <br /> nstalled.Com lete the following cbecklist: <br /> Yes ❑ No• I For equipment startup or annual equipment cenificalion, was a leak simulated to verify LLD performance' <br /> ❑ NIA !Checkall char applpl Simulated leak rat'. 93 g.p.h.: U 0.1 g.p.h: U 0.2 g.p.h. <br /> X Yes O No* Were all I.I.Ds confirmed operational and accurate within regulatory requirements'? <br /> Yes J Nu• Was the testing apparatus properly calibrated? <br /> Yes ❑ No- For mechanical LLDs.dues the LLD rcslrici product flow if it detects a leak? <br /> ❑ NIA <br /> Yes ❑ No' For electronic LLDs.does the turbine automatically shut off if the 1.1-13 detects a Irak? <br /> N/A <br /> Yes ❑ No• For electronic LLDs.does the mrhine atwatutically shut ol'f if any portion of the marinating system is disabled <br /> ❑ NIA or disconnected? <br /> Yes ] No- For electronic LLDs.does the turbine automatically shut off if any portion of the monitoring system'malfunctions <br /> ❑ N/A or fails a test? <br /> XT Yes ❑ No* For electronie I_LDs,have all accessible wiring connections been visually inspected'! <br /> ❑ N/A <br /> Ycs ❑ No- Were all items on the equipment manulaaurer's maintenance checklist completed? <br /> • In the Section 11,heluw,describe ham and when these defit-iencies were or will he corrected. <br /> H. Comments: <br /> Page 3 of 3 Oval <br />
The URL can be used to link to this page
Your browser does not support the video tag.