Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: X Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in4ank gauging equipment is used to perform leak detection monitoring. <br /> Complete the foliouMAngchecklist: <br /> ❑ Yes i) No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes No' Was accuracy of system product level readings tested? <br /> ❑ Yes No' Was accuracy of system water level readings tested? <br /> ❑ Yes -i No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all Items on the equipment manufacturer's maintenance checklist completed? <br /> •In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the followin checklist: <br /> X Yes ❑ No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> ❑ N/A that apply) Simulated leak rate: x 3 g.p.h.; 110.1 g.p.h; 710.2 g.p.h. <br /> Yes X No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes ❑ No' Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if It detects a leak? <br /> X WA <br /> x Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> WA <br /> x Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> WA disconnected? <br /> x Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails <br /> N/A a test? <br /> X Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ WA <br /> X Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: THE DIESEL PLLD DID NOT PASS. IT WAS REPLACED ON 1111812014. THE LINE NEEDED TO BE <br /> PERGED IT WAS RETESTED ON 1/2/2015 BY JAMES DAY AS PER THE PERMIT. <br /> Monitoring System Certification Page 3 of 4 12/07 <br /> 3 2/21/07 <br />