My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:19 PM
Creation date
11/8/2018 9:44:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
TESORO (MOBIL) 68222
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2132\PR0231669\COMPLIANCE INFO\COMPLIANCE INFO 2016.PDF
QuestysFileName
COMPLIANCE INFO 2016
QuestysRecordDate
6/15/2017 6:48:05 PM
QuestysRecordID
3131588
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veeder-Root Line Leak Application Guide <br /> 4. Locate red switch bank labeled S1 on the CPT's Controller CPU board,and verify that dip switch 2 is set to the Closed <br /> position (to enable the PLLD precision line leak function),and dip switch 8 is set to the Open position(to disable the CPT's <br /> line leak function). <br /> 5. Verify that the Rotary Pressure Dial,also on the CPT's Controller CPU board, is set to either the 2(24 psi),3(27 psi),4(30 <br /> psi),5(33 psi), or 6(36 psi)position. <br /> -ciao O``t ciwwmiia.aa <br /> i <br /> t� <br /> - - Tv <br /> _°`" -. O it <br /> DPLLD or PLLD <br /> ' o transducer <br /> ji <br /> DPLLD or PLLD Only <br /> p transducer O 0),in SwiftCheck <br /> l0 O Valve ;O SpikeCheck <br /> O O Valve Assy. <br /> Functional <br /> Element <br /> Red Jacket Standard CPT Red Jacket Quantum CPT <br /> Transducer Installation - Red Jacket Big-Flo Pumps, Red Jacket Maxxum Pumps and FE Petro <br /> High Capacity Pumps <br /> BIG-FLO PUMPS <br /> 1. You will need to install a reducing tee(customer supplied)in either of the 3-inch discharge ports of the pump with the 2- <br /> inch opening facing up. If you have the room, it may be easier to install this tee between the Pressurstat kit and the unused <br /> port instead of in the discharge line(as shown in the figure below).Alternatively,the DPLLD or PLLD transducer can be <br /> installed in the leak detector port of a Big-Flo leak detector if it is already present in the line(as shown in the figure below). <br /> 2. Install the Red Jacket Big-Flo Pressurstat Kit(Red Jacket part number 144-314-5)following the instructions with the kit. <br /> 3. Thread the DPLLD or PLLD transducer into the 2-inch opening of the tee. <br /> - IMPORTANTI Seal any pipe threads using a UL-classified,nontoxic pipe sealant suitable for the fuel involved. <br /> 4. Verify that the TLS-350 Series Console has Version x19 or later(TLS-450 Series Console has Version 1 or later)software. <br /> Junction brat <br /> OPTIONAL INSTALLATION EXAMPLE (customer supplied) <br /> tp r ,' y. r <br /> 3/4'NPT Union, o: �. '.>. v <br /> 3/4'NPT nipples, DPLLD or PLLD transducer . <br /> retlucing nipple / Seal-off,epoxy seal per NFPA <br /> 1 3"tlischarge line s customer supplied) <br /> (customer supplied) (to tlispensers) pec( PP ) <br /> .` conduit to console <br /> (customer supplied) <br /> DPLLD or PLLD transducer in 2'port <br /> jj of Big-Flo Leak Detector(customer <br /> / l �upPlied) <br /> Red Jacket Big-Flo 3"x 3'90 degree elbow <br /> Red Jacket Big-Flo Pressurstat kit- <br /> Pressurstat kit- 2"x 2'x 3"retlucing tee PIN 144-314-5 (customer supplied) <br /> PIN 144-314-5 and 3"NPT nipple (customer supplietl) 3"discharge line(to dispensers) <br /> (customer supplied) (customer supplied) <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.