My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
INSTALL_2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:08:54 PM
Creation date
11/8/2018 9:46:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2007
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
RALEYS FUEL STATION #356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MORADA\4219\PR0524617\INSTALL 2007.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vacuum Sensor System Installation Guide Vacuum Integrity Test Prior to Filling Tank(Optional) <br /> Press STEP to continue.: <br /> s 1: (Vacuum Label) <br /> RELIEF VALVE PRESSURE:-9.0 <br /> Enter the pressure at which the installed Relief Valve is rated to open (the vent pressure is stamped on the body of <br /> the V-R Relief Valve).The permitted range is-5 to-9 psi. Default vent pressure is-9 psi. Press ENTER to confirm <br /> your entry. Press Tank/Sensor to setup another Vac Sensor. <br /> Vacuum Integrity Test Prior to Filling Tank (Optional) <br /> Skip to'Running a Manual Test' if this optional test is not going to be performed. <br /> If an external vacuum source is not used to produce a vacuum in the monitored zones prior to startup,you must <br /> perform a'Manual Test'on each sensor to clear the'No Vac' alarm. <br /> A procedure to test the integrity of the interstitial spaces monitored by the Veeder-Root Vacuum Sensor system is <br /> discussed in this section.An external vacuum source and necessary fittings must be supplied by the customer. <br /> Before beginning this procedure all vacuum sensor components in the sump must be installed as described in this <br /> manual and be connected to a SmartSensor module in the TLS Console. <br /> 1. Shut off, tag,and lock out power to the pump. <br /> 2. At the TLS Console,configure each of the monitored Vac Sensors in the sump (ref.TLS-3XX Setup Manual). <br /> Go to the SmartSensor Diag and place each of the monitored Vac Sensors in EVAC HOLD (ref.TLS-3XX <br /> Troubleshooting Manual). <br /> 3. At the 3-way ball valve in the cap of the tank's interstitial riser, remove the tubing going to the Vac Sensor from <br /> the fitting in the 3-way ball valve and connect the external vacuum source to the fitting.With the valve open to <br /> the external vacuum source, pull a vacuum down to-8 psi,or if a relief valve is present,down to 1 psi above <br /> the relief valve's opening pressure (e.g., if valve opens at-7 psi, pull the vacuum down to-6 psi). <br /> 4. When the desired vacuum is attained,move the 3-way ball valve to the other position. Remove the external <br /> source from the valve's fitting and reconnect the tubing to the Vac Sensor. Move the valve back to the'normal' <br /> position. <br /> 5. If necessary, repeat this procedure for the product line's interstitial space,the vapor line's interstitial space and <br /> the double-wall sump's interstitial space. <br /> 6. With all of the monitored interstitial spaces under vacuum,at the TLS Console,stop the EVAC HOLD for each <br /> Vac Sensor.After a minimum wait of 12 minutes,monitor the Leak Rate and Time to No Vac display for each <br /> Vac Sensor.Record the displayed values for each of the sump's vac sensor in the chart in Appendix B. <br /> As a general guideline,the Time to No Vac should ideally be 100 hours,and should not be less than 24 hours <br /> (a time less than 2 hours will produce an alarm).Also,a Leak Rate greater than 22.4 gph will generate a Vacu- <br /> um Warning. Both of these diagnostics are indicators of whether the system has a significant vacuum leak. <br /> Note that on systems with small volumes,a very small leak rate,well below the 22.4 gph limit, may still cause a <br /> Time to No Vac alarm. <br /> If either diagnostic exceeds the guideline,the source of the leak should be corrected before the system is <br /> started up.Once the leak(s) is corrected, repeat steps 2-6. <br /> 7 When the monitored interstitial spaces under vacuum are within normal operating limits as described in Step <br /> 6,fill the tank. <br /> 8. Once the tank is full, restore power to the pump. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.