My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
INSTALL_2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:08:54 PM
Creation date
11/8/2018 9:46:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2007
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
RALEYS FUEL STATION #356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MORADA\4219\PR0524617\INSTALL 2007.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation <br /> Dual-Point Hydrostatic Sensor Installation <br /> 1. Turn Off power to the console. <br /> 2. Lower the sensor into the riser until it rests on the bottom of the reservoir(see Figure 2).Note:Refer to the <br /> tank manufacturees instructions for setting the proper brine levels.The ideal brine solution level is <br /> approximately halfway between the high and low water levels.With the Dual-Point Sensor resting on the <br /> inner-tank wall,the sensor will alarm when the brine level is below 2"or when the brine level is above 12". <br /> 14"min. die. <br /> manhole Cord grip nut/bushing <br /> / (vent rap not shown) <br /> Concrete slab "��a �F� ` <br /> or packed earth qp#5? p X99. <br /> per NFPA 80 <br /> Riser pipe cap Seal-off <br /> Dual-point Weatherproof 1/2" rigid <br /> hydrostatic sensor jjuon�ction conduit <br /> (to Console) <br /> Float <br /> Brine level <br /> Reservoir <br /> Double-wall <br /> tank <br /> seiuorsVssenep.eps <br /> Figure 2. Dual-Point Sensor Installation(sham with plastic riser cap) <br /> 3. Riser Cap Installation <br /> a. If you have the plastic riser cap kit <br /> Place the cord grip bushing into either of the threaded fittings in the plastic tap and screw the cord grip <br /> nut over the bushing.With the nut loose,push the end of the sensor cable through the cord grip. Place <br /> the cap in the riser and snap down the cap lever to seat the gasket against the inside of the pipe.Screw the <br /> vent cap from the kit down snugly onto the other threaded fitting of the riser cap. <br /> b. If you have the metal riser cap and vent tube <br /> Install the vent tube into one of the cord grips in the metal riser cap (ref.Figure 5 on page 7) and tighten <br /> the cord grip. Loosen the other cord grip and push the sensor cable through it. Place the tap in the riser <br /> and snap down the cap lever to seat the gasket against the inside of the pipe. <br /> 4. With the sensor still resting on the bottom of the reservoir, leave a little slack in the sensor cable and tighten <br /> the cable cord grip nut. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.