My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
INSTALL_2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:08:54 PM
Creation date
11/8/2018 9:46:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2007
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
RALEYS FUEL STATION #356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MORADA\4219\PR0524617\INSTALL 2007.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 � <br /> SAN JOAQ IN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ,f 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mut. <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Mm. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> FACITTYNAME RAr-r.M's Arse E M03. <br /> FACILITY SITE ADDRESS Z E, MOP-ACA W. Me" CITY sroc_(,TCD JJ Mm <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Moa <br /> accordance with the equipment manufacturers'instructions,or annual ,whichever is more frequent. Such work most be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): M02 <br /> III. MONITORING LOCATIONS <br /> This monitoring plan most include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Sim Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information include it with this plan. <br /> IV. TANK MONITORING <br /> ;WL <br /> ON TORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M1o. <br /> I.CONTINUOUS ELECTRONIC MONITORING OF TANK A AR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: <br /> C] <br /> SECONDARY L QUID FILLED [I c.UNDER PRESSURE- f7JI d.UND VACUUM M° <br /> PANEL MANUFACTURER: jApe e. I^/I� ! Mt2. MODEL#: /z�JSO M13. <br /> LEAK SENSOR MANUFACTURER: M14 MODEL#(S): E)l� 1015. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKS) 3499 <br /> PANEL MANUFACTURER: M16 MODEL#: Mlf. <br /> IN-TANK PROBE MANUFACTURER: yeeaer MI8. MODEL#(S): MI9. <br /> LEAK TEST FREQUENCY: [23 &CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M2e. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): Met <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M2z M33. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ &MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M2^. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: 9 a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): W6. Mn. <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY otonsa n.agemy.pprovd) <br /> ❑ 99.OTHER(Specify)- M28 <br /> V. PIPE MONITORING <br /> ,MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> ty 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/rRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: &DRY b.LIQUID FR,LED ❑ c.UNDER PRESSURE d.U�N7DE V/A/CUUM Mar <br /> PANEL MANUFACTURER �eQ�PI r� M32. MODEL M S J �e`� M35. <br /> LEAK SENSOR MANUFACTURER: __L M34. MODEL#(S): nit M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? 0 a.YES ❑ It.NO Mas <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ff a.YES ❑ b.NO MA. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFAC URER(s): M38 MODEL#(S): C M39. <br /> Q] 3.ELECTRONICFURTECTO{�L )T�FAT RO�TIY PERFORMS 3.0 g.p.h. TESTS <br /> ELLD MANUFACTURER, { i LEAK MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: <br /> ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.I g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? d a.YES ❑ b.NO M43- <br /> tS WILL ELLD FAILUREIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? a YES ❑ b.NO m44 <br /> ❑ 4.INTEGRITY TESTING g5�� <br /> TEST FREQUENCY: W a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. Moa <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY' ❑ C.MRN.MONTHLY&EACH TIME SYSTEM OPERATED-* Mas. <br /> -R"n.s,eri'W.W ..Mowd for monitoring ofonburied emerge Y e error fud piping only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(ax3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) M49. <br /> SJCEHD-d(07/03).1/4 0723/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.