My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
INSTALL_2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:08:54 PM
Creation date
11/8/2018 9:46:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2007
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
RALEYS FUEL STATION #356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MORADA\4219\PR0524617\INSTALL 2007.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t UNDERGROUND STORAGE TANK <br /> 11111111111111 <br /> MONITORING PLAN-PAGE 2 <br /> MONITORING OF AREAS BENEO <br /> ATH DISPENSER(S) PERPORMED SSINRG THE FOLLOWING G METHOD(S)(Check all that apply) M50 <br /> 1.CONTINUOUS ELECTRONIC MONITQ OF ER ER DI PENSP�CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: ,����77 <br /> CSP ���{— ) ,. /f <br /> LEAK SENSOR MANUFACTURER: 1 Mst MODEL#: / v-- <br /> WILL DETECTION OF A LEAK INTO THE mss nuz. <br /> UDC TRIGGER AUDIBLE AND VISUAL ALARMS? q(S): <br /> WILL A UDC LEAK A M54. <br /> LARM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YE ❑ b.NO mss. <br /> WILL FAB,URE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? �.,/ <br /> El 2-MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY IN UDC TRIPS S 93 a.YES ❑ h.NO Mss. <br /> ) HEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER. D� a YES ❑ b.NO msr. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY M5e. MODEL q(S): <br /> ❑ 4.NO DISPENSERS ❑ b.WEEKLYfueywre„se,ry, ,t) W9. <br /> ❑ 99.OTHER(Specify) mw. <br /> 1.WE HAVE BEEN NOTIFIED BY THE ir V11.gERNHA111 ,NCEDOI AK DERTECCTI`ON mal. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> AK <br /> MUST IMPLEMENT ENHANCED LEAK mvo. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Checkk all t apply)- <br /> 2. `�ll,�vG <br /> � THIS <br /> ERA OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT( <br /> AN(Required) M80. <br /> 3 THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as or 1/ol/200eS) <br /> 4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5.70 CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - <br /> STATISTICAL INVENTORY RECONCILIATION' <br /> 7' C] SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" MEAL AND <br /> 99.>9�OTHER(Specify): <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to thenjob duties and can access those documents when needed. <br /> By January 1,2005 this facility will have a"Designated UST Operato who has M81. <br /> January 1,2005,and is acilit thereafter,the "Desi Passed the operator exam administered by the <br /> grated UST Opemmr"will train facility employees in the proper operation and maintenanceofional of the nUST systems <br /> This[mining will include,but is not limited ro,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> The facility employee's role with regard to spills and overfills. <br /> Y Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January I,2005,the initial training will be conducted within 30 days of the date of hire. <br /> Please use th s sect on to nclude any additi CO JL sre]�ITII nNT$/reADDIT�OINAL INI O rI�IATo OIN ed b <br /> / ( g N y you:1ocal gency):jm,5 <br /> V.o- ®� 1 Yyf)��i( Pik r4�� " fU <br /> ,� <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF 1/1/05, THE "DESIGNATED UST OPERATOR"IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION— <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQWMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR 6 2715Q2). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTI JCA TION:I mrt! that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNER/OPE RA TOR SIGNATURE REPRESENTING[DATE: <br /> �' ❑Owner mm. m91. <br /> Operator _ <br /> O R/ ERAT ME(print): m9z. WNE PE OR TITLE: Mgr. <br /> IrY <br /> (Agency Use only <br /> This plan has been reviewed nd: p roved ` <br /> (� ' ff PP ❑Approved With Conditions ❑ roved <br /> Local Agency Signature: W.N(J1 , f `O_ <br /> Date: l <br /> Comments/Special Conditions: <br /> SJCEHD-d(07/03)-3/4 <br /> 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.