Laserfiche WebLink
Ill N COUN <br /> TS ENVIRONMENTAL <br /> TYPE OF ACTION RHEALTH <br /> UNDERGROUNDSTORAGETANK DEPARTMENT <br /> ESPONSE PLAN_PAGE I <br /> �( I.NEW PLAN <br /> ❑ 2.CHANGE OF INFORMATION (One form <br /> per facility) <br /> FACILITY ID# (Agency Use Only) I• FACILITYMI, <br /> FACB,ITY NAME /nT �TION <br /> FACB,ITAy 5 E D]i ISL E <br /> /�� Roz <br /> 1�1� A R03, CITY <br /> ThisII. SPILL CO S RA <br /> Buse Plan addresses u1laWlonzed releases from UST system NTROL AND CLEANUP METHODS <br /> Business Ptan. Y ms and supplements the emergency Po <br /> > If safe n da so Facility personnel will take imm E h' rise plans and procedures in the facili s H <br /> remaining hazardous material from the UST edlate measures to control or stop 4' azardous Materials <br /> > Any release to Seco rystem. P any release(e.g.,activate pump shut-off,etc.)and,if recess <br /> contain the hazer n material, <br /> mrtlen[will be pumped or otherwise removed within a time consistent with the ability of the sewn al safely remove <br /> dour material,bra not areata than 30 calendar days,or sooner if required by the local a <br /> for their intended use,will be managed as ha than waste <br /> > Absorbent material will be used to contain g°nCy. Recovered h 'containment system to <br /> and clean u azard°us materials,unless still suitable <br /> ED be effective, I[will then be m P manageable spills of hazardous materials. Absorbent material ma <br /> > Facility unaged ero r net Used absorbent material,reusable or waste,will be stored in a properly labeled and wale container. <br /> ty persomlIt will determine whether or o[any water removed from sewn Y be reused until it becomes too saturated <br /> hazardous material. If the water n contaminated it will be Managed secondary containment systems,or from clean- <br /> contaminated. A thick floating petroleum ta ss hazardous waste. If the water has a le activity,um sheen has been in contain with any <br /> will not be dis yer may not necessarily display rainbow colors. Water(hazardous or non haze dous)from sum rainbow colors), it is <br /> disposed to storm water sysxttts <br /> > We will review secondary containment systems for possible deterioration if any of the following conditions occur: Ps.spol containers,etc. <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary <br /> 2 Secondary containment is prone to damage from any equipment used to remove or clean u h <br /> 3. Hazardous Material, other than the Bary containment; <br /> product/waste stored in the rim P 0°ssystem material collected in secondary containment, <br /> released prtdue"'waste,and the added material or resulting matenal from such a combination s notcom comlaced patible Se sewn <br /> dnd containment t.treat or neutralize <br /> III. SPLL.L CONTROL P dart containment. <br /> PERIODIC MAINTENANCE:S '`SND CLEAN-UP EQIJIp]y1EN7' <br /> pIl omml and clean-up equipment kept pemlarlently on-site is listed in the facility's Hazardous Materials Business plan This <br /> equipment is inspecmd az leas[monthly,and ager each use and supplies are replenished as needed. Defective equipment is re <br /> paired or replaced as necessary. <br /> UIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: Com tete onI if Iicable <br /> EQUIPMENT LOCATION <br /> RID. AVAILABILITY <br /> R30. <br /> 0.11. Rl0 <br /> R21. <br /> Rll. <br /> R11. <br /> R22. <br /> R2. <br /> RD. R33 <br /> R33. <br /> R14 <br /> R36. <br /> R0. <br /> RI3. <br /> R2. <br /> RI3. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSONS)LS/ARE RESPONSD3LE FOR AUTHORIZING A <br /> NAME NY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> I rs ^ <br /> NAME Rao, TITLE no <br /> o <br /> aal. TITLE <br /> NAME1 <br /> aaz. TITLE ` <br /> Rsz. <br /> NAME Rai ` <br /> TITLE <br /> R33. <br /> V. INDIRECT HAZARD DETERMINATION <br /> This information is required ur when the o nary of the hazardous substance <br /> measluemots in a annular space or secondary can not be determined directly by the monitoring method used(e.g.,where liquid level <br /> rank piping are used as the basis for leak determination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> ase. <br /> 0625103 <br /> aw"'\ <br />