Laserfiche WebLink
1.0 INTRODUCTION <br /> ' Kroeker, Inc in support of our contract to Pacific Gas &Electric Company (PG&E) for <br /> removal of underground tanks at Tracy. California. <br /> ' Kroeker will conduct all site activities in accordance with a Site Specific Health and Safety Plan <br /> (HASP) to ensure adequate protection for site personnel. This (HASP) meets the requirements of <br /> ' the Occupational Safety and Health Administration (OSHA) as codified in 29 CFR 1910.120 <br /> (Hazardous Waste Operations and Emergency Response). <br /> ' 1.1 Facility Site Description <br /> Two underground tanks will be removed within the confines of the PG&E,Tracy <br /> ' Facility. Both tanks are located beneath the fuel island and concrete drive aprons <br /> in the Facilities yard near a warehouse storage building. <br /> ' 2.0 ON-SITE ORGANIZATION AND RESPONSIBILITIES <br /> ' 2.1 Identification of Key Personnel <br /> The following personnel are designated to carry out the stated job function. <br /> ' NOTE: One person may carry out more than one job function. However, when <br /> such collateral duties appear to require simultaneous attention, the health and <br /> safety activities will take immediate precedence over any other duty(ies). <br /> Kroeker,Inc. General Manager: Jeff Kroeker <br /> ' Field Supervisor: Neil Heely,REA <br /> ' Site Health and Safety Officer: Neil Heely, REA <br /> Field Team Members: John Andrews <br /> Martin Mendoza <br /> 6 <br />