My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 11:01:14 AM
Creation date
11/8/2018 9:46:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MYRTLE\2849\PR0538822\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
4/13/2018 5:07:30 PM
QuestysRecordID
3854464
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification Form: Addendum for Vacuum/Pressure Interstitial Sensors <br />I. Results of Vacuum/Pressure Monitoring Equipment Testing <br />This page should be used to document testing and servicing of vacuum and pressure interstitial sensors. A copy of <br />this form must be included with the Monitoring System Certification Form, which must be provided to the tank <br />system owner/operator. The owner/operator must submit a copy of the Monitoring System Certification Form to the <br />local agency regulating UST systems within 30 days of test date. <br />J. Comments: DURING TESTING S-2, S-4 & S-5 ALL IN NO VAC, FUNCTIONALITY TESTING CANNOT BE <br />PERFORMED IF VACUUM CANNOT BE REPRODUCED <br />Page 4 of 4 <br />' If the sensor successfully detects a simulated vacuum <br />/pressure leak introduced in the interstitial space at the furthest point from the <br />sensor, vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br />UN - 036A. it wTnv.unidocs.org Rev0 01/26/06 <br />Manufacturer: VEEDER ROOT <br />Model: TLS -350 <br />System Type: ❑ Pressure; <br />® <br />Vacuum <br />Sensor ID <br />Component(s) Monitored by this Sensor: <br />DIESEL <br />TANK 1 - D T - 1 - PRODUCT LINE <br />S <br />- 1 <br />Sensor Functionality Test Result: ® Pass; <br />❑ Fail <br />Interstitial Communication Test Result: <br />® <br />Pass; <br />❑ <br />Fail <br />Component(s) Monitored by this Sensor: <br />DIESEL <br />TANK 1 - D T -1 - SYPHON LINE <br />S-2 <br />Sensor Functionality Test Result: ❑ Pass; <br />❑ Fail <br />Interstitial Communication Test Result: <br />❑ <br />Pass; <br />❑ <br />Fail <br />Component(s) Monitored by this Sensor: <br />DIESEL <br />TANK 1 - D T -1 as VENT LINE <br />S-3 <br />Sensor Functionality Test Result: ® Pass; <br />❑ Fail <br />Interstitial Communication Test Result: <br />® <br />Pass; <br />❑ <br />Fail <br />Component(s) Monitored by this Sensor: <br />DIESEL <br />TANK 2 - D T - 2 - PRODUCT LINE <br />S <br />- 4 <br />Sensor Functionality Test Result: ❑ Pass; <br />❑ Fail <br />Interstitial Communication Test Result: <br />❑ <br />Pass; <br />❑ <br />Fail <br />Component(s) Monitored by this Sensor: <br />DIESEL <br />TANK 2 - D T as 2 - VENT LINE <br />S <br />- 5 <br />Sensor Functionality Test Result: ❑ Pass; <br />❑ Fail <br />Interstitial Communication Test Result: <br />❑ <br />Pass; <br />❑ <br />Fail <br />Component(s) Monitored by this Sensor: <br />GAS TANK <br />1 - G T no 1 - PRODUCT LINE <br />S-6 <br />Sensor Functionality Test Result: ® Pass; <br />❑ Fail <br />Interstitial Communication Test Result: <br />® <br />Pass; <br />❑ <br />Fail <br />Component(s) Monitored by this Sensor: <br />GAS TANK <br />1 - G T - 1 - VENT LINE <br />S <br />- 7 <br />Sensor Functionality Test Result: ® Pass; <br />❑ Fail <br />Interstitial Communication Test Result: <br />® <br />Pass; <br />❑ <br />Fail <br />Component(s) Monitored by this Sensor: <br />GAS TANK <br />1 - G T -1 - VAPOR RETURN LINE <br />S <br />- 8 <br />Sensor Functionality Test Result: ® Pass; <br />❑ Fail <br />Interstitial Communication Test Result: <br />® <br />Pass; <br />❑ <br />Fail <br />Monitored by this Sensor: <br />[EComponent(s) <br />Sensor Functionality Test Result: ❑ Pass; <br />❑ Fail <br />Interstitial Communication Test Result: <br />❑ <br />Pass; <br />❑ <br />Fail <br />Component(s) Monitored by this Sensor: <br />ll Sensor Functionality Test Result: ❑ Pass; <br />❑ Fail <br />Interstitial Communication Test Result: <br />❑ <br />Pass; <br />❑ <br />Fail <br />How <br />was interstitial communication verified? <br />❑ Leak <br />Introduced at Far End of Interstitial Space;' ❑ Gauge; <br />® Visual Inspection; ❑ Other (Describe <br />in Sec. <br />J, below) <br />Was <br />vacuum/pressure restored to operating levels in all interstitial spaces? ® Yes ❑ No (If no, describe <br />in Sec. <br />J, belotii) <br />J. Comments: DURING TESTING S-2, S-4 & S-5 ALL IN NO VAC, FUNCTIONALITY TESTING CANNOT BE <br />PERFORMED IF VACUUM CANNOT BE REPRODUCED <br />Page 4 of 4 <br />' If the sensor successfully detects a simulated vacuum <br />/pressure leak introduced in the interstitial space at the furthest point from the <br />sensor, vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br />UN - 036A. it wTnv.unidocs.org Rev0 01/26/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.