Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: <br />SAN JOAQUIN REGIONAL TRANSIT - R T D <br />I Date of Testing: 9/4/2018 <br />Facility Address: <br />2849 <br />E. MYRTLE AVENUE STOCKTON, CA 95201 <br />Facility Contact: <br />JOHN <br />Phone: <br />Date Local Agency Was Notified <br />of Testing: 8/21/2018 <br />Name of Local Agency <br />Inspector <br />(f present during testing): STACY R. <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 416 2"d Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Ed Stearns ® Zane A. Nimmo ❑ David A. Winkler ❑ Felix G. Ramirez <br />8883080 -UT 8883064 -UT 8883059 -UT 8883072 -UT <br />Credentialsl: ®ICC Service Tech. ®SWRCB Tank Tester <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ®Hydrostatic 11 Vacuum <br />U Other <br />Test Equipment Used: TAPE MEASURE, H2O Equipment Resolution: 1/16" <br />Identify Spill Bucket (By Tank 1 87 12 3 DIESEL DT - 1 14 DIESEL DT 2 <br />Number, Stored Product, etc. <br />❑ Direct Bury E] Direct Bury <br />❑ Direct Bury ❑ Direct Bury <br />Bucket Installation Type: ® Contained in Sump ❑ Contained in Sump ® Contained in ® Contained in <br />Sump Sum <br />Bucket Diameter: 11 11 11 <br />Bucket Depth: 16 16 16 <br />Wait time between applying <br />vacuum/water and start of test: <br />Test Start Time (TI): 1230 1230 1230 <br />Initial Reading (RI): 16 16 15 1/4 <br />Test End Time (TF): 1330 1330 1330 <br />Final Reading (RF): 16 16 15 1/4 <br />Test Duration (TF — Ti): H O U R <br />Change in Reading (RF - Ri): 0 0 0 <br />Pass/Fail Threshold or <br />('ritPria• �- _- -- -- <br />Test Result: <br />El Pass ®Fail ❑Pass ❑Fail ®Pass El Fail <br />Comments — (include information on repairs made prior to testing, and recommended follotiv-zrp for failed tests) <br />INSPECTOR CLAIMS TO HAVE SEEN VISIBLE LEAK DURING TEST, HOWEVER FLUID LEVEL DID <br />®Pass ❑Fail <br />NOT DROP <br />AND A PASSING NUMBER WAS RECORDED, HOWEVER THIS VISIBLE LEAK CONTINUED THROUGHOUT <br />THE ENTIRETY OF THE TEST. I DO NOT AGREE TO THE FAILURE BUT SITE REPRESENATIVE WILL <br />RESCHEDULE A RETEST AND PERFORM IT HIMSELF TO VERIFY MY CONCLUSION <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THI <br />S TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: 4f5 Date: 9/4/2018 <br />1 State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />