My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 9:47:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 2016 - PRESENT.pdf
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
11/18/2016 5:11:43 PM
QuestysRecordID
3261353
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UL/ULC Listed Red Threadgll A Piping System <br /> GENERAL SPECIFICATIONS <br /> Primary Piping <br /> SECTION 1 - Qggpe <br /> This section covers the use of fiberglass reinforced plastic 2.06 Acceptable Manufacturers - NOV Fiber Glass <br /> (FRP) pipe for single wall fuel handling and fuel handling vent Systems, 501-568-4010,or approved equal. <br /> and vapor applications Including gasoline, unleaded gasoline, <br /> gasoline/alcohol mixtures, bio-diesel and diesel up to 150°F <br /> Section 3 - Material and Construction <br /> and 250 psig cyclic pressure. <br /> 3.01 2"-4" Pipe - The pipe shall be manufactured by <br /> the filament winding process using an amine cured epoxy <br /> SECTION 2 - General Conditions thermosetting resin to impregnate strands of continuous <br /> 2.01 Material furnished and work glass filaments, which are wound around a mandrel at a <br /> performed under this section shall be coordinated with the 543/4° winding angle under controlled tension. The pipe <br /> related work and equipment specified under other sections, shall be heat cured and the cure shall be confirmed using a <br /> i.e.Valves, Flexible Connectors, Equipment. Differential Scanning Calorimeter. <br /> Pipe shall be supplied with a T.A.B.- (Threaded and <br /> 2.02 Governing Standards - Except as modified or Bonded)ends. <br /> supplemented herein, all materials and construction methods Pipe shall have a minimum continuous cyclic pressure <br /> shall comply with and be tested in accordance with the rating of 125 psig at 150°F in accordance with ASTM L12992, <br /> following standards and test methods: Procedure A or UL 971 pressure rating. <br /> Standards and Test Methods: All pipe shall be 1009& hydrotested at the factory before <br /> UL971 Standard for Nonmetallic Underground Piping for Flam- shipment at a minimum pressure of 265 psig and shall be <br /> 2004 mable Liquids UL971-2004 Listed and labeled. <br /> ASTM Standard Classification for Machine-Made"Fiberglass" 3.02 ASTM D2310 Classifications fat 73.41F1 <br /> D2310 (Glass Fiber Reinforced Thermosetting Resin)Pipe 2--3- RTRP-IIAF <br /> ASTM Standard practice for obtaining Hydrostatic or Pressure q" RTRP-I 1 AH <br /> D2992 Design Basis for"Fiberglass" (Glass Fiber Reinforced (Mechanical properties cell classifications shown are <br /> Thermosetting Resin)Pipe and Fittings minimums.) <br /> 3.03 F€ttl1)gs - All fittings shall be manufactured using <br /> 2.03 Operatinci Conditions - In addition to the above the same type of material as the pipe. Fittings may be <br /> listed minimum design requirements, the system shall meet manufactured either by compression molding, filament <br /> the following minimum operating conditions: winding, resin transfer molding or contact molding methods. <br /> a. Operating Pressure All fittings, adapter, and sump penetrations shall be UL971- <br /> 2004 Listed. <br /> b. Fluid Conveyed Fittings shall be adhesive bonded matched tapered bell <br /> c. Test Pressure and spigot. <br /> 3.04 Connections - Connections to flex connectors or <br /> 2.04 Quality Assurance - Pipe manufacturer's quality other piping materials shall be made by the use of NPT <br /> program shall be In compliance with ISO 9001 and/or API O1. (National Pipe Thread) threaded adapters or flanges bonded <br /> to the FRP piping system. <br /> 2.05 Delivery. Storage. and Handling - Pipe and fittings 3.05 Sump Penetrations - Sump penetrations shall be <br /> shall be protected from damage due to impact and point made by means of a permanently bonded FRP coupling. The <br /> loading. Pipe shall be properly supported to avoid damage coupling shall be capable of adjusting for the slope of the <br /> due to flexural strain. The contractor shall not allow dirt, piping system entering or exiting the sump wall. <br /> debris or other extraneous materials to get into pipe and 3.06 Adhesives - Adhesives shall be manufacturer's <br /> fittings. All factory machined areas shall be protected from standard for the piping system specified. <br /> sunlight until installed. <br /> VOWWAgapipe.com <br /> 2700 West 65th Street 25 S.Main Street 171''' Fiber Glass Systems <br /> Little flack,Arkansas 72209 Sand Springs,Oklahoma 74063 <br /> Phane:1 (501)568-4010 1(918)245-6651 <br />
The URL can be used to link to this page
Your browser does not support the video tag.