Laserfiche WebLink
Section 3 - Material and Construction 3.06 Adhesives - Adhesives shall be manufacturer's <br /> 3.01 2"-4riary&3"-6" Seoondary Pipe-The pipe standard for the piping system specified. <br /> "Pm <br /> shall be manufactured by the filament winding process using <br /> an amine cured epoxy thermosetting resin to impregnate 3.07 Aooeptable Produots -- RED THREAD IIA Piping <br /> strands of continuous glass filaments, which are wound System as manufactured by NOV f=iber Glass Systems or <br /> around a mandrel at a 54314"winding angle under controlled engineered approved equal. <br /> tension. The pipe shall be heat cured and the cure shall be <br /> confirmed using a Differential Scanning Calorimeter. <br /> SECTION 4 - Installation and Testina <br /> Pipe shall be supplied with T,A.B.(Threaded and Bonded)or <br /> plain ends, 4.01 7raininq and Certification - All joints installed or <br /> constructed in the field shall be assembled by employees <br /> Pipe shall have a minimum continuous cyclic pressure of the contractor who have been trained by the pipe <br /> rating of 125 psig at 150°F in accordance with ASTM D2992, manufacturer. The pipe manufacturer or their authorized <br /> Procedure A or UL 971 pressure rating. representative, shall train the contractor's employees in the <br /> All pipe, both primary and secondary, shall be 100% proper joining and assembling procedures required for the <br /> hydrotested at the factory before shipment at a minimum project, including hands-on participation by the contractor's <br /> pressure of 265 psig and shall be UL 971-2004 Listed and employees. Each bonder shall fabricate one pipe-to-pipe <br /> Labeled. and one pipe--to-fitting joint that shall pass the minimum <br /> pressure test for the application as stated in Section 2.03 <br /> 3.02 ASTM 02310 Classifications (at 73.41F) without leaking. <br /> Primary Pipe Secondary Pipe Only bonders that have successfully completed the <br /> pressure test shall bond pipe and fittings. Each bonder shall <br /> 2-3"3" RTRP-11AF 3" RTRP-11AF carry a current, manufacturer proof of training card. <br /> 4" RTRP-11AH 411-6" RTRP-11AH <br /> (Mechanical properties cell classifications shown are 4.02 Pipe Installation-Pipe shall be installed as specified <br /> minimums.) and Indicated on the drawings. <br /> The piping system shall be installed in accordance with <br /> 3.03 Fittinas - All fittings shall be manufactured using the manufacturer's current published installation procedures. <br /> the same type of material as the pipe. Fittings may be <br /> manufactured either by cornpression molding, filament <br /> winding, resin transfer molding or contact molding methods. 4.03 Testing - A hydrostatic pressure test shall be <br /> All fittings, adapter, and sump penetrations shall be UL971- conducted an the completed piping system. The piping <br /> 2004 Listed. system shall be subjected to 10 pressurization cycles from 0 <br /> psig to 1.5 times the design operating pressure as stated in <br /> Primary fittings shall be adhesive bonded, matched Section 2.03.c. After the 10 cycles,the pressure shall be held <br /> tapered bell and spigot and rated the same as the pipe, on the system for a minimum of 1 hour and the line inspected <br /> Secondary containment fittings shall be two-piece style for leaks. <br /> to allow for 100% inspection of the primary joint pressure test Test pressures shall not exceed 1.5 times the maximum <br /> and be rated to a minimum of 50 psig per UL 971-2004. rated pressure of the lowest rated element in the system. <br /> Should hydrostatic testing be impractical, testing with <br /> low pressure air or inert gas may be acceptable. Extreme All pipe joints shall be water tight. All joints that are found <br /> caution should be used when testing with air. Follow all to leak, by observation or during testing shall be replaced by <br /> safety precautions and testing recommendations of the pipe the contractor and retested. <br /> manufacturer. <br /> Should hydrostatic testing be impractical, testing with <br /> 3.04 Conneotions - Connections to flex connectors or low pressure air or inert gas may be acceptable_ Extreme <br /> other piping materials shall be made by the use of NPT caution should be used when testing with air. Follow all <br /> (National Pipe Thread) threaded adapters or flanges bonded safety precautions and testing recommendations of the pipe <br /> to the FRP piping system. manufacturer. <br /> 3.05 Sums Penetrations - Sump penetrations shall be <br /> made by means of a permanently banded FRP coupling. The <br /> coupling shall be capable of adjusting for the slope of the <br /> piping system entering or exiting the sump wall. <br />