Laserfiche WebLink
FIe,%W©RKS <br /> BY DPW CI)ELING GONTAiNMENT 5V5TEMS <br /> 8.0 PIPE BURIAL REQUIREMENTS not be greater than 30". A pipe sensor must also be placed <br /> OPW-FCS's flexible piping and access piping are strong,yet in the terminating dispenser sump or tank sump,whichever <br /> still flexible,piping systems and must be buried in such a is at a lower elevation. <br /> manner that they will not compress. The burial requirements NOTE: Check your local code regulations for fall require- <br /> depend on proper pipe trenching,backfill material and burial ments other than that which is previously stated. <br /> depth.Follow these instructions for warranty compliance: 8.3.2 Suction Piping Systems <br /> 8.1 Trench Sizing Sloping the OPW-FCS flexible piping from the dispenser back <br /> Piping trenches should be dug in such a manner that the to the tank is always required for suction piping systems <br /> trench width is equal to at least twice the width of all the where maintaining prime is necessary.Shallow dispenser <br /> flexible pipes contained within. All piping within the trench sumps are recommended for use in this application. <br /> should be separated by the outside diameter of the piping 8.4 Pipe Trench Backfilling <br /> being installed with a required minimum of 2"(50 mm)of <br /> separation for all piping. Trench turns should be sweeping Backfilling of the flexible Piping System should occur only <br /> rather than sharp angles.The bottom of the trench should be after the final integrity testing has been performed on both <br /> compacted and as uniform as possible to eliminate high the primary and the secondary of the pipe. Prior to backfill- <br /> spots to insure an even layer of bedding material under the ing completely,hand shovel the backfill material between <br /> pipe. Remove all sharp rocks and debris from the trench bot- and to the outside of the pipe to maintain the minimum re- <br /> tom before bedding material is installed. quired spacing between the pipes and walls of the trench. <br /> Final backfilling shall be done slowly and evenly in 4"to 6" <br /> 8.2 Bedding&Backfill Materials layers as not to disturb the spacing of the pipe and to insure <br /> Approved bedding and backfill materials for 0PW-FC5's fiexi- no voids are present in the backfill. An additional air test is <br /> ble piping,sumps and Access piping shall meet the following recommended after backfilling to insure the backfill process <br /> specifications: has not damaged the pipe. <br /> 8.2.1 Pea Gravel 8.5 Overburden <br /> Rounded pea gravel is permitted with a minimum diameter The type of surface installed above the piping can have an <br /> of 1/8"and a maximum diameter of 3/4". overloading effect on the flexible piping.Follow the overbur- <br /> 8.2.2 Crushed Stone den specifications below for product warranty compliance. <br /> Crushed stone is permitted providing it shall be washed CAUTION:FlexWorks piping and Access piping can be <br /> clean and be of the free flowing type with an angular stone punctured by grade stakes or other sharp objects driven <br /> size between 1/8"and 1/2".(Meets ASTM C-33 paragraph 9.1 into the ground.The use of tracer tape or a schematic of <br /> requirements.) the underground piping should be kept onsite and <br /> marked off prior to commencing any work that may dam- <br /> 8.2.3 Sand age the pipe. <br /> Sand backfill is permitted providing it shall be washed clean 8,5,1 Unpaved Surfaces <br /> and is free flowing with a maximum content of 10%fines. <br /> When backfilling,make sure sand is evenly distributed and If the surface is unpaved,then a minimum of 18"(457mm)of <br /> fully compacted under and fully around the piping. approved backfill material should be installed between the <br /> NOTE:A minimum of 6"(152mm)of approved bedding top of all flexible piping and the top of the ground surface. <br /> material shall be spread and compacted evenly along the 8.5.2 Paved Surfaces <br /> bottom of the piping trench.All bedding and backfill ma- If the surface is paved with either asphalt or concrete the <br /> terial should be clean and free from ice and snow and total amount of pavement plus approved backfill material <br /> debris.Using material other than those described above shall be a minimum of 18"(457mm)between the top of ei- <br /> without written approval from OPW will void the product ther the flexible piping and the top of the paved surface. <br /> warranty. 8.5.3 Access Pipe Burial <br /> 8.3 Flexible Pipe Sloping Whether the surface is paved or unpaved with either asphalt <br /> If a continuous slope or"fall'is required from the last dis- or concrete then there shall be a minimum of 16"(406mm) <br /> penser on a piping run to the tank,then the tanks should be between the top of the Access Pipe and the top of the paved <br /> buried at a sufficient depth and the pipe entry height into or unpaved surface, <br /> the dispenser sump should be of sufficient elevation so that 9,0 FLEX PIPING OPTIONS <br /> 1/8"of fall per linear foot is maintained.OPW does not re- <br /> quireits Flexible pipe to be sloped in pressure systems. The OPW`s Piping System offers several types of pipe cou- <br /> pling options.These options,in turn,allow for a variety of <br /> 8.3.1 Pressure Piping Systems piping application options for the flexible pipe used in both <br /> If the full system warranty is desired,the difference in eleva- pressure piping systems and suction piping systems. <br /> tion of the piping between two dispenser sumps must <br />