Laserfiche WebLink
Xlexible Underground Piping Manual FIE!)MORKS <br /> BY OPW FUELING CONTAINMENT SYSTEMS <br /> 12.0 DISPENSER SUMP PIPE CONNECTIONS 13.0 FLEXIBLE PIPE FABRICATION <br /> The plumbing connections required inside dispenser sumps After all plumbing trees have been installed inside the tank <br /> can be simple or complicated depending upon the plumbing sumps and riser assemblies installed into either the deep or <br /> requirements,dispenser size,and pipe entry locations.Pipe shallow dispenser sumps,fabrication and installation of the <br /> entries that are located considerably off the center line may flexible piping may proceed. <br /> require the use of flex connectors as riser pipes instead of IMPORTANT:Only currently certified contractors with a <br /> rigid steel riser pipes. valid factory training card are authorized to install OPW <br /> The type of piping application specified shall determine what piping. <br /> type of piping connections shall be made inside dispenser 13.1 Pipe Handling At Jobsite <br /> sumps. <br /> Care must always betaken when handling OPW flexible pip- <br /> 12.1 Riser Pipe Assemblies ing to prevent damage.It is recommended that the carton be <br /> Riser pipe assemblies are designed to interconnect one or placed in the sunlight several hours before measuring and <br /> two flexible pipe sections to the above ground product dis- cutting the pipe,so the pipe may relax for easier extension <br /> penser.At the top end they may or may not be fitted with a when measuring. <br /> shear valve and are typically mounted to a stabilizer bar.At WARNING:Do not drag,cut or scrape the pipe during in- <br /> the low end they may be fitted with either tee fittings or el- stallation to avoid damage to the external surface of the <br /> bow fittings.Refer to the following riser pipe options availa- piping.Use only OPW approved backfill materials. <br /> ble with OPW's flexible piping system. <br /> 13.2 Cold Weather Pipe Handling <br /> 12.1.1 Steel Pipe Riser Measuring: <br /> OPW's flexible piping can be installed in ambient tempera- <br /> Cutting the steel riser pipe to the proper length will allow the tures as low as zero degrees,provided that the flexible piping <br /> piping to enter the dispenser sump on a straight and level has been sufficiently warmed prior to unrolling.If the pipe is <br /> plane and in line with the tees,elbows and adapters.Improp- unrolled and straightened while it is warm,it will cool in a <br /> er riser length results in stress at the pipe fitting/pipe cou- straighter position making it easier to install.For cold weather <br /> pling connection.Please follow the steps noted below: installations where the ambient temperature is below 40°F(5° <br /> • Install the stabilizer bars in their proper position,per C),it is recommended that the piping cartons be placed in a <br /> OPW Stabilizer Bar Installation Instructions,which can be warm room for 8 hours directly prior to installation.If this is <br /> determined by the dispenser manufacturer's footprint for not possible,then a small hole should be cut in the top center <br /> the particular dispenser model. This will allow for proper of the lid of the carton for insertion of the nozzle of a conven- <br /> vertical alignment. tional hair dryer.For piping reels,place a tarp over the reel <br /> • Install the shear valve to the shear valve mounting plate and then insert the hair dryer nozzle directly into the end of <br /> and secure this to the stabilizer bar in accordance with the piping.If this pipe warming procedure is used,do not use <br /> the dispenser manufacturer's footprint. the first 12"of the pipe due to possible damage by the hair <br /> dryer. Depending on the ambient temperature,it may take <br /> • Install the entry boots in accordance with the OPW Entry up to an hourto warm the roll of piping sufficiently. <br /> Fitting installation instructions. <br /> 13.3 Flexible Pipe Measuring <br /> • Line up the center of the entry boot with the center of When measuring the distance between containment sumps <br /> the opening of the tee,elbow or adapter. or pans to determine the proper length of a flexible pipe sec- <br /> • Determine the length of the steel riser by measuring be- tion to be installed,it is important to considerthat the pipe is <br /> tween the bottom of the shear valve and the top of the flexible and will not be installed perfectly straight.A slight <br /> tee,then add 1-1/2"to that length prior to cutting the weaving of the pipe in the piping trench is recommended to <br /> NPT threads for each end of the riser. compensate for expansion and contraction. The recom- <br /> • Install the riser to the top of the shear valve with the use mended measuring and cutting procedures forthe flexible <br /> of soft set pipe dope that is approved for use with petro- piping are described below: <br /> leum products. 13.3.1 Direct Pipe Burial Applications <br /> • Install the tee,elbow or adapter to the bottom of the When measuring for direct burial of flexible piping,the meas- <br /> riser,positioning it properly to align with the entry fitting uring points will be from the face of one adapter/fitting to <br /> horizontally,with the use of soft set pipe dope that is the next. If swivel couplings and fittings are used,subtract 1" <br /> approved for use with petroleum products. to allow for the length of the two pipe couplings and cut the <br /> Reinstall the riser set up to the stabilizer bar and then piping to that length. If Swivel Bolt-On couplings(SBC)are <br /> make sure that the tee,elbow or adapter opening is on used,measure from the shoulder of one fitting to the shoul- <br /> center with the entry fitting opening on both the hori- der of the corresponding fitting and cut pipe to that length. <br /> zontal and vertical plane. 13.3.2 Access Pipe Burial Applications <br /> • Assure that the opening of the tees,elbows or adapters For Applications using Access Pipe,measurements must be <br /> are all on center with the entry fitting,on both the hori- taken through the Access Pipe to insure proper length.Feed <br /> zontal and vertical plane. the measuring tape through the Access Pipe and measure the <br />