My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 9:47:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 2016 - PRESENT.pdf
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
11/18/2016 5:11:43 PM
QuestysRecordID
3261353
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jj"! Underground Piping Manu Ff0,*VV0RKS <br /> BY DPW FUELING COIIITAINMENT SYSTEMS <br /> distance from the face of the one adapter/fitting to the next. 13.6.1 Positioning Swivel Pipe Coupling <br /> If swivel couplings and fittings are used,subtract 1"to allow Install the appropriate size faceplate,unscrew and remove <br /> for the length of the two pipe couplings and cut the piping to the tapered swage from the threaded shaft. <br /> that length. See Access Pipe installation instructions for Lubricate the inside of the coupling insert with <br /> complete information and installation steps. metal assembly paste or white lithium grease. <br /> 13.4 FlexWorks Pipe Cutting Insert the pipe coupling assembly,including <br /> When cutting the piping into pipe sections,cut the pipe at the ferrule over the threaded shaft and seat it Big <br /> the measured cut mark using the pipe cutter tool.This cut- onto the face plate. <br /> ting tool is designed to make clean and even cuts in the pip- Note: Do not place ferrule on the piping.Ferrule must be <br /> ing. Clean and even piping cuts are necessary for the proper inserted over the insert of the coupling. <br /> installation of the DPW pipe couplings. 13.6.2 installing The Tapered Swage <br /> 13.4.1 Cutter Positioning Thread the tapered swage onto the threaded <br /> Mark the pipe where it is to be cut. Next position the blade of shaft until it meets the back of the pipe cou- <br /> the pipe cutter over the mark. pling assembly. <br /> 13.4.2 Blade Activation NOTE:Do not use silicone based lubricants. <br /> Squeeze the handles up and down to activate the movement Be sure that the swivel nut of the pipe cou- <br /> Ilk <br /> of the blade. Continue until the blade will no longer continue pling assembly is flush against the face <br /> to activate.This procedure will cause the pipe to slightly com- plate. <br /> press. 13.6.3 Inserting the Pipe <br /> 13.4.3 Pipe Cutting Insert the end of a flexible pipe section inside <br /> Rotate the entire pipe cutter 1/4 turn to permit the blade to the pipe coupling until it bottoms out.Inspect <br /> penetrate the wall of the pipe. Continue to squeeze the han- the entire assembly,prior to switching on the <br /> dles up and down to complete the entire pipe cut.Inspect machine for the following: <br /> the cut to make sure it is even. • Swivel nuts are flush against the base plate. <br /> NOTE: Do not rotate blade more than 1/4"turn.Inspect 0 The coupling and pipe are totally vertical. <br /> edge of cut and inside of piping after cutting for any signs • The ferrule is snug against the insert shoul- <br /> of damage. <br /> der. <br /> 13.5 Coupling Flexible Pipe Sections <br /> 13.6.4 Swaging <br /> The flexible piping system requires the use of the DPW Cou- To begin the swaging process,turn the switch <br /> pling Machine for proper installation of the pipe couplings to the DOWN position.Once the tapered swage <br /> onto the flexible piping sections. passes through the pipe coupling assembly,the motor will <br /> 97 <br /> IMPORTANT: Using the coupling machine with piping and/ turn off.Remove the coupled pipe section. Turn the switch to <br /> or couplings not manufactured by DPW shall void the cou- the UP position to allow the drive shaft to re- <br /> pling machine warranty.Before and after the coupling pro- turn to the starting position. <br /> cess the supplied dust cover should be kept on the coupling. 13.6.5 Inspection y <br /> This precaution will lessen the possibility of damage. For <br /> complete instructions,please refer to the DPW coupling ma- Inspect the installed pipe coupling assembly <br /> chine installation instructions. and pipe,inside and out,to make sure there <br /> 13.6 Machine Set-up was no damage to the insert,ferrule,swivel nut <br /> or pipe during the swaging operation. <br /> • Remove cover and install under the base. Always replace the protective coupling cap after the coupling <br /> • Install the correct face plate. has been swaged onto the pipe end. <br /> • Install the correct threaded shaft. NOTICE:Before and after the coupling process,the pr tective <br /> • Install the correct size swage kit. coupling cover should be kept on the coupling. <br /> • Open the vent plug. This precaution will lessen the possibility of damage and con- <br /> tamination by dirt,sand and debris that could compromise <br /> • Plug in machine with extension cord. the sealing process. <br /> IMPORTANT: Connect the coupling machine to a properly IMPORTANT:Connect the coupling machine to a properly <br /> grounded outlet only. Piping must be held vertically grounded outlet only. Piping must be held vertically <br /> throughout the coupling process. throughout the coupling process. <br /> WARNING: OPW's coupling machine is not intrinsically IMPORTANT:Using this coupling machine with pipe or <br /> safe and can not be used in hazardous areas. couplings other than those manufactured by OPW will <br /> void the product warranty. <br />
The URL can be used to link to this page
Your browser does not support the video tag.