My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 9:47:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 2016 - PRESENT.pdf
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
11/18/2016 5:11:43 PM
QuestysRecordID
3261353
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,Flexible Undergrou ng Manual FIE_2_*W RKS <br /> SY OPW FUELING GGNTAINMENT SYSTEMS <br /> NOTE:OPW recommends hydrostatic testing on all sumps <br /> after installation is complete to check for proper sealing Piping Expansion Characteristics <br /> of joints and connections. Pipe DescriptionVolume <br /> 17.4.1 Water Filling 1-1/2"Flexible Piping +0.0015 <br /> Gradually introduce water at the lowest point into the piping <br /> system and bleed off air at the highest point in the piping 2"Fiberglass Piping +0.00045 <br /> system through an open valve.The hydrostatic pressure ap- 1-1/2"Flexible Connectors +0.0060 <br /> plied should not exceed 60 psi. <br /> 17.4.2 Pressure Hold Inspection *Volume Increase=gallons per linear foot at 60 psi pres- <br /> Maintain pressurization for a minimum of one hour making sure. <br /> sure there is no drop in pressure.Significant temperature 19.0 INTERSTITIAL INTEGRITY TESTING <br /> changes can result in a pressure reading differential.During Prior to supply filling and periodically over the life of the flexi- <br /> the pressurizing period,inspect all piping connections for ble piping system,it is recommended that interstitial testing <br /> leaks. be used to ensure that the secondary containment is intact. <br /> 17.5 Supply System Filling 19.1 Air Pressure/Soap Testing <br /> After the supply piping system has been integrity tested and After the inner primary flexible pipe and piping connections <br /> connected to the product dispensers,filling of the pipe line have been integrity tested,the entire interstitial space of the <br /> may commence.There should be a controlled method for double wall pipe must remain connected and only then <br /> filling the supply line which provides an adequate means of should the outer containment jacket be integrity tested. <br /> removing air from the lines.Do not start pumps with empty <br /> lines,as it may damage the pipe and its connections.Small 19.2 Testing Assembly <br /> amounts of trapped air should dissipate under normal opera- Inside all tank sumps the test gauge is connected to the end <br /> tions.Make sure that the pressure rating of the submersible of the test tube.The test gauge assembly consists of an air <br /> pump does not exceed that of the maximum operating pres- gauge with a maximum 15 psi scale connected to a 1/4"brass <br /> sure of the pipe. tee fitting with a male 1/4"thread.The gauge threads directly <br /> 18.0 PERIODIC LINE LEAK DETECTION into female brass fitting of the test tubes.The test tube in the <br /> Local or federal regulations may require periodic fine leak terminating sump shall be capped with a.25"brass plug. <br /> detection tests be performed on the installed piping system. 19.3 Air Pressure Testing <br /> Testing requirements affect both suction and pressure piping Gradually pressurize the piping's interstitial space through <br /> systems.A typical requirement is that the piping lines must the test tube to no more than 10 psi.During the pressuriza- <br /> be tested on an annual basis at one and one half(1-1/2)times tionperiod,apply an air pressure soap test to the entire pip- <br /> the normal operating pressure. ing line. After testing,disconnect the air hose and lay the test <br /> The typical test method will require detection of 0.10 gallons tube down into the bottom of the tank sump. <br /> (.3785 liters)per hour with a 95%probability of detection and 20.0 FLEXWORKS SYSTEM MAINTENANCE <br /> a 5%probability of a false alarm. The FlexWorks System is designed to provide reliable under- <br /> The typical test procedure requires the piping be isolated ground fuel transfer and short-term secondary containment <br /> from the tank and the piping line pressurized to 1-1/2 times of leaked petroleum product_FlexWorks sumps and second- <br /> the normal operating pressure.A test apparatus which is con- ary containment pipes are not intended for long term storage <br /> netted to the piping line will then measure the bleedback of petroleum products.Liquid that accumulates in the sec- <br /> volume of the piping system.Acceptable bleedback volumes ondary containment system must be promptly removed and <br /> on different types of piping systemswill vary due to their in- properly disposed of.Operational third party approved liquid <br /> herent expansion and contraction characteristics.Therefore, sensors should be installed and maintained in each sump to <br /> modtfications in the testing procedures are required for pip- reliably indicate to the operator that liquid is present in the <br /> ing systems which have significant expansion and contrac- secondary containment system.Once a leak is detected,the <br /> tion characteristics.This characteristic is measured in the av- system must be shut down immediately and the source of <br /> erage volume increase,per linear foot under a standard test the leak must be repaired.All liquid must be thoroughly <br /> pressure. flushed and cleaned out of the secondary containment sys- <br /> 18.1 FlexWorks Piping Expansion Characteristics tem at once.Inspect all system components at least monthly <br /> for leaks or damage,and repair or replace any suspect com- <br /> FlexWorks Piping is a multi-layer reinforced smooth bore flex- ponent as necessary. <br /> ible pipe which demonstrates only minor expansion and con- 20.1 ROUTINE SUMP INSPECTIONS <br /> traction characteristics during pressurization and depressuri- <br /> zation,similar to that of fiberglass piping.These physical Visual inspections of all containment sumps and components <br /> characteristics reduce the affect on the"bleedback tolerant- should be made on a routine basis to check for damage,wa- <br /> es"permitting a more accurate testing procedure. ter infiltration or for any signs of leaking product.An elec- <br /> tronic or mechanical shut-off leak detection system is recom- <br />
The URL can be used to link to this page
Your browser does not support the video tag.