My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 9:47:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 2016 - PRESENT.pdf
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
11/18/2016 5:11:43 PM
QuestysRecordID
3261353
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flexible Underground Piping Manual FIe_*VV0RKS <br /> BY OPW FUELING CONTAINMENT SYSTEMS <br /> 0.75=18"radius packaging until ready to use. <br /> 1.0"= 18"radius • Keep all thread protectors secure until ready to use. <br /> 1.5"=24"radius <br /> 2.0"—36"radius • Keep all coupling protector caps/covers in place. <br /> 3.0"=72"radius . DO NOT drag,cut or scrape pipe. <br /> 23.2.6 Fluid Flow Efficiency . Upon completion of pipe,inspect for cuts,scrapes and <br /> Both the primary inner and secondary outer pipe shall have damage prior to close of pipe runs. <br /> an interior surface which is a smooth(non-corrugated)profile • DO NOT exceed 15°angle entry for pipe into a sump. <br /> and be made of a low friction resistant material for improved Please visit our website,www.opwglobal.com,for a detailed <br /> fluid flow efficiency. <br /> guide specification. <br /> 23.2.7 Operating Pressures&Vacuums <br /> The flexible underground piping shall have a minimum five <br /> to one(5:1)safety factor from maximum operating pressure <br /> for rated pressure.The maximum operating pressure rating <br /> for 1.5"diameter piping shall be 100 psi primary and 10 psi <br /> secondary.3/4", 1",2"and 3"piping shall be rated at a maxi- <br /> mum operating pressure of 75 psi primary and 10 psi second- <br /> ary.For suction systems the pipe shall be capable of with- <br /> standing 29"mercury vacuum. <br /> 23.2.8 Pipe Expansion <br /> The primary supply pipe shall not expand more than.0025% <br /> in diameter and overall length when pressurized to 60 psi to <br /> permit accurate pressure decay readings by an in-Eine leak <br /> detector. <br /> 23.2.9 Interstitial Interconnection <br /> All primary and secondary piping shall be connected in such <br /> a way as to permit integrity testing both during installation <br /> and at periodic intervals in the future.Both primary and sec- <br /> ondary piping shall remain continuous during operation. <br /> 23.2.10 ULI Testing <br /> Flexible piping and it's associated fittings shall be inde- <br /> pendently tested in accordance with UL 971. <br /> 24.0 Storage and Handling <br /> 24.1 Storage <br /> OPW-FCS requires that all piping,fittings and system <br /> components be stored in such a manner that they will not be <br /> subject to direct sunlight and/or excessive environmental <br /> conditions.Please review the below noted warnings during <br /> product storage. <br /> • Cover all products with UV protective tarps if outside. <br /> • If tarps are unavailable,store in trailer or building until <br /> use. <br /> 24.2 Handling <br /> OPW-FCS requires that the piping,fittings and system com- <br /> ponents are handled in such a manner that it will not cause <br /> unnecessary damage to the system components. <br /> Please review the below noted warnings during product han- <br /> dling_ <br /> • Do not drop,cut or impact the components. <br /> • Keep all piping,fittings and components in the original <br />
The URL can be used to link to this page
Your browser does not support the video tag.