Laserfiche WebLink
Mar0$ 16 01:11 p JP Petroleum Service <br /> 9163724573 P 5 > <br /> SWRCB.January 2002 <br /> %'' AFR 0 6 2016 <br /> • <br /> Page of <br /> 7. ]UNDER-DISPENSER CONTALVMENT DC TESTIN(; <br /> Test Method Developed By: ❑UDC Manufacturer p Industry Standard X Professional Engineer <br /> Other(Spec) <br /> Test Method Used: �Pressure C Vacuum <br /> X Hydrostatic <br /> Ll Other(Specify) <br /> Test Equipment Used; Caldwell Systems <br /> Equipment Resolution: .005/30 min <br /> INER UDC4-2 1-2 --- — <br /> UDC#3-4 UDC#5-6 UDC#/7-8 <br /> UDC ManuFacturer. Environ Environ <br /> UDC Material: Pol Environ Environ <br /> UDC Depth: — 30" 30Po[Y 0-1.1Po[ <br /> 30" " <br /> Height from UDC Bottom to Top 81, 8" 30„ <br /> of Highest Piping Penetration: g,. <br /> Height from UDC Bottom to 5" 5" 5„ <br /> Lowest Electrical Penetration: 4" <br /> Condition of UDC prior to D <br /> testing: rY Dry Dry Dry <br /> Portion of UDC Tested 2"above Highest <br /> PipingPenetration <br /> Does turbine shut down when �... <br /> UDC sensor detects liquid(both x Yes 17 No D NA x Yes ❑No 0 NA x Yes ro ❑No is NA duct and►r,ater)?` x Yes ❑No NA <br /> Turbine shutdown ties onse time — <br /> Is system programmed for fail- <br /> safe shutdown?' xYes 0 No ❑NA x Yes L No ❑N A x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> Was fail-safe verified to be <br /> op erational?' __J Yes x No ❑NA ❑Yes x No ❑NA ❑Yes x No ❑NA ❑Yes x No 11 NA <br /> Wait time between applying <br /> pressurervacuum/water and 5 min 5 min 5 min <br /> startin test 5 min <br /> Test Start Time: 12:40 12:30 <br /> Initial Reading(R,); 00" 11:10 <br /> .0,0" .OD" <br /> Test End Time. 1.10 1.04 .Op" <br /> Final Reading(RF): -00 .00 _ 11:40.DO <br /> Test Duration: 30 min 30 min 30 min n in Reading(Rr-R]): 00 30 min <br /> 00 .00 <br /> Pass/Fail T7treshold or Criteria: -005/30 min .005/30 min .005/30 min 005/30 min <br /> Was sensor <br /> Test sensor <br /> #: x Pass ❑Fail x Pass ❑Fail © Pass x Fail x Pass ❑Fail <br /> rcmov©d for Testing? x Yes ❑No [7 NA x Yes C No DNA x Yes G No 11 NA x Yes ONO 7 NA <br /> Was sensor properly replaced and <br /> verified functional after testin-? x Yes Q No ❑NA x Yes [~No ❑NA x Yes ❑No ❑NA x Yes .❑No ❑NA <br /> Conn"I1:S—(include information on re airs made prior to tesfin , and recommendedoflow-u or failed tests) <br /> UDC 5-6 has torn penelranonfiyfng at sump wall <br /> If the entire depth of the UDC is not tested,specify how much was tested. if the answer to any of the questions indicated with an <br /> astcrisk(*)is"NO"or"NA",the entire uDC must be tested. (See SWRCB 1,G-150) <br />