My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 9:47:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 2016 - PRESENT.pdf
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
11/18/2016 5:11:43 PM
QuestysRecordID
3261353
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar 08 16 01:11 p JP Petroleum Service <br /> 916724873 e4 <br /> APR 06 ?0 i <br /> SWRCiB,January 2002 Page, of <br /> 6. PIPING SUMT TESTING <br /> Test Method Developed By: ❑Sump Manufacturer C Industry Standard X Professional Engineer <br /> ❑Other(Specie) <br /> Test Method Used: D Pressure D Vacuum X Hydrostatic <br /> O Other(Spec) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: -.0050 min <br /> Sump 4 1 Sump#2 2 <br /> F Sump# Sump# <br /> Sump Diameter: 42'' 42" - <br /> Sump Depth: 46" 45„ <br /> Sump Material_ Fiberglass Fiberglass <br /> Height from Tank Top to Top of <br /> 21" <br /> }3i est P" in Penetration: 23„ <br /> Height From Tank Top to Lowest <br /> Electrical Penetration: 23" 21" <br /> Condition of sump prior to testing: pry Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both x Yes C1 No CNA x Yes ❑No DNA D Yes C No DNA ❑Yes ONO ENA <br /> product and water <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?` x Yes ❑No DNA x Yes 1J No DNA D Yes C No ❑NA El Yes ❑NO L NA <br /> Was fail-safe verified to be <br /> a onal?' G Yes x No [INA ❑Yes x No ❑NA ❑Yes E No Q NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting , 5 thin 5 min 5 min i min <br /> test: <br /> Test Start Time: 4:25 9-15 <br /> Initial.Reading(Rr): _00" .00" .00" 00" <br /> Test End Tette: 9:55 9:45 <br /> Final Reading(R,): .00 .00 <br /> Test Duration_ 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-R,): .00 .00 <br /> Pass/Fail Threshold or Criteria: .005130 min .005/30 min .005/30 min _005130 min <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass [] Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? gxYcs <br /> ❑No DNA x Yes ❑No DNA x Yes ❑No DNA ❑Yes ❑No C.NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ❑No DNA x Yes ❑No ❑NA x Yes ❑No Cl NA fl Yes or <br /> Nb FI TVA <br /> Comments= (include information an repairs made prior to testing. and recommended fallow-up for failed resrS) <br /> ' If the entire depth of the sump is not tested, specify how much was tested. If the answer to My of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SX RCS LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.