Laserfiche WebLink
'FIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK v.00 <br /> MONITORING PLAN (Page 2 of 2) <br /> Vh UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> - - 490.54a <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54b <br /> 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS_ 099.-OTHER(Specify)_ — — — — ----------- — - - <br /> ------------------------------I MODEL# - <br /> - ---- <br /> ago 56. <br /> PANEL MANUFACTURER: <br /> —LEAK SENSOR MANUFACTURER IVp e6,r_- s a9a s7 i MOREL#{S): p Z Gy560 00 i 490 58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS $ a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN 'W a.YES ❑b.NO 490-60. <br /> FAILURE 1 DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 1P a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. iA a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS 191.SINGLE-WALLED ❑2.DOUBLE-WALLED 49x63 <br /> IF DOUBLE WALLED: -496-baa <br /> UDC INTERSTITIAL_SPACE IS MONITORED BY: ❑ 1.LIQUID---[:]-2.PRESSURE---❑3_VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64h <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION{ELDIMUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REgUIRE17 <br /> ❑2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. _ 490-66 <br /> ❑3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br /> VIII RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 490-68a ❑Visual Inspection Records 490-68b 1%Tank integrity testing results 490-68c <br /> SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> ❑ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-68g <br /> ,Equipment maintenance and calibration records. 490-68b <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities arc familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> 154 THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-690 <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49D-69f <br /> SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> OtlP,r rVGfi WA ViStx• More-o t,,.+i 1 6-k <br /> XI.PERSONNEL RESPONSIBILITIES '10"/, <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME SttA <br /> 0-90-72 TITLE >nh Q/" 490-73 <br /> NAME 'j 490-74 TITLE A 490-75 <br /> The Designated Operators all perform a monthly visual inspection of the facility, provide a rep rt to the owner/operator, and inform the ownerloperator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:i certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLI NT SIGN RE 490-76 DATE: 490-7� <br /> REPRE . TING: L ank 0v r! mtm 2-Facilit Owncrl0 erator 3.Auihonzed Rc resentative of Pwner <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE: 490-79 <br /> u�a 1 r <br />