Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps <br /> Fill Riser Containment Sumps are Present,but were Not Tested <br /> Test Method Developed By: E Sump Manufacturer Industry Standard Professional Engineer <br /> Other(Spec) <br /> Test Method Used: F1 Pressure Vacuum 1=1 Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Fill Sum # Fill Sump# Fill Sump# Fill Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: Pass Fail Pass Fail Pass Fail Pass Fail <br /> Is there a sensor in the sump? Yes No Yes No Yes No Yes No <br /> Does the sensor alarm when Yes ❑No L NA <br /> either product or water is _Yes ❑No L.NA ❑Yes ElNo 11NA ❑Yes No NA <br /> detected? <br /> Was sensor removed for testing? Yes ❑No ❑NA ❑Yes = No NA Yes ❑No ❑NA Yes No NA <br /> Was sensor properly replaced and ❑Yes ❑No ❑NA ❑Yes CI No ❑NA O Yes ❑No ❑NA ❑Yes E No NA <br /> verified functional after testing? <br /> Com meets—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> No Fill Sumps <br />