Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard ❑Professional Engineer <br /> Other(Specify) <br /> Test Method Used: L Pressure i�]Vacuum Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 87 vad Spill Box# 91 n%0 Spill Box#91s vjj Spill Box# <br /> Bucket Diameter: 12.00" 12.00" 12.00" <br /> Bucket Depth: 13.00" 13.00" 13.00" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: 10:30am 10:30am 10:30am <br /> Initial Reading(Rt): 12.00" 12.00" 12.00" <br /> Test End Time: 11:30am 11:30am 11:30am <br /> Final Reading(RF): 12.00° 0.001, 12.00° <br /> Test Duration: 60 minutes 60 minutes 60 minutes <br /> Change in Reading(RF-Ri): 0.001, 12.00" 0.00" <br /> Pass/Fail Threshold or 0.062" 0.062" 0.062° <br /> Criteria: <br /> Test Result: ' Pass Fail Pass L, Fail i✓, Pass Fail Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 91 north vapor bucket failed due to cracked bottom.bucket is OPW direct bury with plastic bottom. checked riser,and adapter also made sure that <br /> rtrain valvp nlnn wag not Ipakine <br />