Laserfiche WebLink
0 <br /> S WRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed By: UDC Manufacturer industry Standard X Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used:INCON TS-STS Equipment Resolution: <br /> UDC# 1/2 UDC#3/4 UDC#4/5 UDC#5/6 <br /> UDC Manufacturer. BROVO BROVO BROVO BROVO <br /> UDC Material: STEEL STEEL STEEL STEEL <br /> UDC Depth: 9" 911 9" 911 <br /> Height from UDC Bottom to Top BOTTOM BOTTOM BOTTOM BOTTOM <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to BOTTOM BOTTOM BOTTOM BOTTOM <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to DRY DRY DRY DRY <br /> testing: <br /> Portion of UDC Tested 611 6" 6" 6" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both D Yes D No X NA ❑Yes D No XNA D Yes D No XNA D Yes D No XNA <br /> product and water)? <br /> Turbine shutdown response time 15 see 15 see 15 see 15 see <br /> is system programmed for fail- <br /> safe shutdown?* D Yes Cl No X NA DYes D No XNA D Yes D No XNA D Yes D No XNA <br /> Was fail-safe verified to be <br /> o erational?1 D Yes D No X NA D Yes D No XNA D Yes D No XNA D Yes D No XNA <br /> Wait time between applying <br /> pressure/vacuum/water and 30 min 30 min 30 min 30 min <br /> starting test <br /> Test Start Time: 11:30 AM 11:30 AM 11:30 AM 10:58 AM <br /> Initial Reading(RO: 1.3754 1.8894 1.4931 5.4445 <br /> Test End Time: 11:45 AM 11:45 AM 11:45 AM 11:13 AM <br /> Final Reading(RF): 1.3751 1.8896 1.4827 5.4443 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Chane in Reading(RF-RT): .0003 .0002 .0004 .0002 <br /> Pass/Fail Threshold or Criteria: .002 .002 .002 .002 <br /> Test Result: X Pass D Fail X Pass D Fail X Pass D Fail X Pass D Fail <br /> Was sensor removed for testing? D Yes D No X NA D Yes D No XNA D Yes D No XNA D Yes D No XNA <br /> Was sensor properly replaced and <br /> verified functional after testing? D Yes D No X NA D Yes D No XNA D Yes D No XNA D Yes D No X NA <br /> Comments—(include information on repairs made prior to testing and recommended follow-up or ailed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />