My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
11/8/2018 9:48:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
5/17/2017 4:28:22 PM
QuestysRecordID
3383804
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> S WRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed By: UDC Manufacturer industry Standard X Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used:INCON TS-STS Equipment Resolution: <br /> UDC# 1/2 UDC#3/4 UDC#4/5 UDC#5/6 <br /> UDC Manufacturer. BROVO BROVO BROVO BROVO <br /> UDC Material: STEEL STEEL STEEL STEEL <br /> UDC Depth: 9" 911 9" 911 <br /> Height from UDC Bottom to Top BOTTOM BOTTOM BOTTOM BOTTOM <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to BOTTOM BOTTOM BOTTOM BOTTOM <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to DRY DRY DRY DRY <br /> testing: <br /> Portion of UDC Tested 611 6" 6" 6" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both D Yes D No X NA ❑Yes D No XNA D Yes D No XNA D Yes D No XNA <br /> product and water)? <br /> Turbine shutdown response time 15 see 15 see 15 see 15 see <br /> is system programmed for fail- <br /> safe shutdown?* D Yes Cl No X NA DYes D No XNA D Yes D No XNA D Yes D No XNA <br /> Was fail-safe verified to be <br /> o erational?1 D Yes D No X NA D Yes D No XNA D Yes D No XNA D Yes D No XNA <br /> Wait time between applying <br /> pressure/vacuum/water and 30 min 30 min 30 min 30 min <br /> starting test <br /> Test Start Time: 11:30 AM 11:30 AM 11:30 AM 10:58 AM <br /> Initial Reading(RO: 1.3754 1.8894 1.4931 5.4445 <br /> Test End Time: 11:45 AM 11:45 AM 11:45 AM 11:13 AM <br /> Final Reading(RF): 1.3751 1.8896 1.4827 5.4443 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Chane in Reading(RF-RT): .0003 .0002 .0004 .0002 <br /> Pass/Fail Threshold or Criteria: .002 .002 .002 .002 <br /> Test Result: X Pass D Fail X Pass D Fail X Pass D Fail X Pass D Fail <br /> Was sensor removed for testing? D Yes D No X NA D Yes D No XNA D Yes D No XNA D Yes D No XNA <br /> Was sensor properly replaced and <br /> verified functional after testing? D Yes D No X NA D Yes D No XNA D Yes D No XNA D Yes D No X NA <br /> Comments—(include information on repairs made prior to testing and recommended follow-up or ailed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.