Laserfiche WebLink
SWRCB,January 2002 Page q of� <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry StandardProfessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: ef4 L 6uuez e-4 'rA 4ev Equipment Resolution: , U G,-_5 <br /> a�n <br /> Sump# 2^Re , SUMP#2-5u r SUMP Lump <br /> Sump Diameter: q2,11 ri Z+ VH <br /> Sump Depth: (off r/ �c 3 it <br /> Sump Material: <br /> Height from Tank Top to Top of Z t 1 23 `t 2 t I <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: L <br /> Condition of sump prior to testing: L>rn r yj 10 r <br /> Portion of Sump Tested' WG4-^-rt_4"L..26" Wg4er-L"teL 2-5" Wa4erl.eµ _L, ar <br /> Does turbine shut down when ❑No ❑NA <br /> sump sensor detectsliquid(both es �es ❑No DNA 'S�es 0N 0N ❑Y ❑ o [INA <br /> roduct and water?. J\ <br /> Turbine shutdown response time '7 <br /> Issystemprogrammedforfail-safe es ❑No DNA es ONo DNA es ❑No DNA ❑Yes No DNA <br /> shutdown? <br /> Was fail-safe verified to be es ❑No ❑NA es ONO ❑NA ;,d'es ❑No DNA ❑Yes No ❑NA <br /> o erational?*. <br /> Wait time betweeailigiying <br /> pressure/vacu water d starting <br /> test: P O rn rvsa�rS l o r"�rr,ete�GS <br /> Test Start Time: Id! 25 17. 40 <br /> Initial Reading(RD: ✓-i�s-l- G-,r4 r`i rra d-e 2 e. <br /> Test End Time: /0! 95- q ! SV // ./.5-0 <br /> Final Reading(RF); ( vi{-C.fi- Fr;,j5-74414,0lC/2 S�Gi�e <br /> Test Duration: 4�s Re M rtw+4"s 30 r f t. L.--S <br /> Change in Reading(RF-R,): /j d <br /> Pass/Fail Threshold or Criteria: t D(JS 30Ix•%- —' e"95 a M i.- r00$13 r-- <br /> Test Result: 92ass ❑.FailPass ❑Fail ass ❑Fail Pass ❑Fa <br /> Was sensor removed for testing? ❑No ❑NA es ❑No DNA es ❑No DNA ❑ es ❑No ON <br /> Was sensor properly replaced and es 11 No [INAes ❑No DNA Yes ❑No DNA Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing and recommended follow-upforfailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />