Laserfiche WebLink
SWRCB,January 2002 Page a' of r7 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: D UDC Manufacturer D Industry Standardprofessional Engineer <br /> D Other(Sped) !\ <br /> Test Method Used: ❑Pressure ❑Vacuum , glIydrostatic <br /> D Other(Spec) <br /> Test Equipment Used: C4 /pct l/4e4-q,( ', ? ._�d;t ,t Car d cn Equipment Resolution: ,b o Zy <br /> UDC#1 fZ UDC# 3 r UDC# 5 4 y UDC# Z t S <br /> UDC Manufacturer: �Olcr (crr /(�y,. .,...,,.� <br /> UDC Material: o! d l pt LC G <br /> UDC Depth: <br /> 2 4'1`2_11 Z3 2 <br /> Height from UDC Bottom to Top O i l 4 'oil <br /> p <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to t <br /> Lowest Electrical Penetration: S + , <br /> C S <br /> Condition of UDC prior to <br /> testing: t7r7 Ory o�y Airy <br /> Portion of UDC Tested Wg4v Lsae t_l3 q wu�e�(��L u tJ e��,t,�,L l(o W,r#e✓(u LL y <br /> Does turbine shut down when es ❑No ❑NA <br /> UDC sensor detects liquid(both 2�Ji es ❑No ❑NA res ❑No ❑NAes ❑No ❑NA <br /> product and water)?. <br /> / J 1 <br /> Turbine shutdown response time 3 &_e_e_ Lf 9-e-C-, <br /> Is system programmed for fail- Yes ❑No ❑NA Yes D No D NA -Yes D No D NA es DNo DNA <br /> safe shutdown?* <br /> Was fail-safe verified to be es ❑No DNA <br /> operational?' es DNo DNA /—Yes DNo DNA )'Yes DNo DNA <br /> Wait time between apnImg <br /> pressure/vacuum/ ter d <br /> starting test !Q/Wnwf its 14 iw Hoc-1-e—T /4, 4-e5 l6 # { <br /> Test Start Time: 4a !2_0 <br /> Initial Reading Rr): jt � P <br /> Test End Time: d/ SU //' 3 S /u_' C) 1 ! S <br /> Final Reading(RF): TOtfr f Gn-G(p f Gypt., Gryr-.(„e <br /> Test Duration: ^rn k .3 a h +^ s 0A 5 <br /> Chane in Reading(RF-R,): d a v a t o <br /> Pass/Fail Threshold or Criteria: r o'is A0 U r.= i V o Olt --- <br /> Test Result: ass D Fail ass 0 Fail Pass 0 Fail ass D Fail <br /> Was sensor removed for testing? es DNo DNA Yes DNo DNA XTes DNo DNA es DNo DNA <br /> Was sensor properly replaced andD NoDNA DNo ElNA es ❑No ❑NA Yes 11 No ❑NA <br /> verified functional after testing? <br /> Comments—(include,information on repairs made prior to testing and recommendedfollow-up forfailed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(f)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />