Laserfiche WebLink
R <br /> SWRCB,January 2002 • Page a of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer �ndustry Standard ❑Professional Engineer <br /> C Other(Specify) <br /> Test Method Used: ja2ressure C Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: ,� ,ML) PipingEquipment Resolution: U -(S- S; <br /> PipingPiping Run# Piping Run# <br /> Piping Material:Piping Manufacturer:Piping Diameter:Length of Piping Run:Product Stored: un <br /> Method and location of <br /> piping-run isolation: �� L`L Snip to S,n <br /> Wait time between applying <br /> pressure/vacumn/water and /0' j.•1 <br /> starting test: <br /> Test Start Time: 10 rr- : ZJ <br /> Initial Reading(RI): Q 2 <br /> Test End Time: '.y - 2J <br /> Final Reading(RF) 7R <br /> Test Duration: r 1 f <br /> Change in Reading(RF-Rj): I <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ,o-Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />