My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2015
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\3550\PR0505827\COMPLIANCE INFO 2008-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R <br /> SWRCB,January 2002 • Page a of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer �ndustry Standard ❑Professional Engineer <br /> C Other(Specify) <br /> Test Method Used: ja2ressure C Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: ,� ,ML) PipingEquipment Resolution: U -(S- S; <br /> PipingPiping Run# Piping Run# <br /> Piping Material:Piping Manufacturer:Piping Diameter:Length of Piping Run:Product Stored: un <br /> Method and location of <br /> piping-run isolation: �� L`L Snip to S,n <br /> Wait time between applying <br /> pressure/vacumn/water and /0' j.•1 <br /> starting test: <br /> Test Start Time: 10 rr- : ZJ <br /> Initial Reading(RI): Q 2 <br /> Test End Time: '.y - 2J <br /> Final Reading(RF) 7R <br /> Test Duration: r 1 f <br /> Change in Reading(RF-Rj): I <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ,o-Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.