Laserfiche WebLink
SWRCB,January 2002 Page_�_of 5 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer dustry Standard 0 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum "ydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: �",n�„r S j Equipment Resolution: �t <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter: Z 1 b <br /> Sump Depth: A, J <br /> Sump Material: r2 I <br /> Height from Tank Top to Top of t1 v <br /> Highest P!ping Penetration: <br /> Height from Tank Top to Lowest t <br /> Electrical Penetration: d Z� <br /> Condition of sump prior to testing: C b- <br /> Portion of Sump Tested' Zti <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ' Yes 0 No DNA IAYes 0 No ❑NA 0 Yes 0 No [INA 0 Yes 0 No ❑NA <br /> productand water)? <br /> Turbine shutdown response time e <br /> Is system programmed for fail-safe <br /> shutdown?* �es 0 No DNA A-Yes 0 No DNA 0 Yes 0 No DNA 0 Yes 0 No 0 NA <br /> Was fail-safe verified to be <br /> o emtional?. 'Ayes 0 No 0 NA ^Yes 0 No DNA 0 Yes 0 No DNA 0 Yes 0 No DNA <br /> Wait time between applying r' <br /> pressure/vacuum/water and starting 10N��v , (WIN <br /> test: <br /> Test Start Time: �,' L17 ;o q <br /> Initial Reading(R,): 0.436 1 ?VU <br /> Test End Time: 11,44 - kiq, h <br /> Final Reading(RF): 0.410 &TO 'g(b <br /> Test Duration: I n 1 S h <br /> Change in Reading(RF-R,): J IS <br /> Pass/Fail Threshold or Criteria: ,poL —,1;;)'L @9Z <br /> Test Result: Pass 0 Fail A�-Pass 11 Fail ❑ Pass ❑Fail 11 Pass ❑Fail <br /> Was sensor removed for testing? ,,/ <br /> Yes 0 No 0 NA d.r es 0 No [INA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> Was sensor properly replaced and <br /> verified functional after testin ? - es 0 No 0 NA UOies 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> COmmenis—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to ARy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />