My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2015
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\3550\PR0505827\COMPLIANCE INFO 2008-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/18/2015 02:13PM 6616349233 KERN CONSTRUCTION PAGE 10/27 <br /> • <br /> SWRCB,January 2002 • <br /> Page 3 of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer x Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: x Pressure 0 Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:4"dial gauge Equipment Resolution:0-15 psi <br /> Piping Run# PiRun#87 Piping Run#Red <br /> p g Piping DSL Pip1°g Run# <br /> Piping Material: PRP FRP <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: 100, 100, <br /> Product Stored: 87 Red DSL <br /> Method and location of <br /> piping-run isolation: Test boot Test boot <br /> Wait time between applying <br /> pressure/vacuum/water and 30 min. 30 min. WR 18 2015 <br /> starting test: <br /> Test Start Time: 11:00 11:00 <br /> Initial Reading(R4): 5.2 PSI 5 - 7 <br /> .0 PSI <br /> Test End Time: 12:00 12:00 <br /> Final Reading(RF): 5.2 PSI 5.0 PSI <br /> Test Duration: 1 HR. 1 HR. <br /> Change in Reading(RF-RI): 0 PSI 0 PSI <br /> Pass/Fail Threshold or <br /> Criteria: 0 PSI 0 PSI <br /> Test Result: 0 Pass . 0 Fail X,Pass .DFail X Pass ,0 Fatl 0,.P&ss.'_❑ELI <br /> Comments— (include information on repairs made prior to testing and recommended ollow-up forfailed tests) <br /> Received Time Mar, 18. 2015 3: 16PM No, 8366 <br />
The URL can be used to link to this page
Your browser does not support the video tag.