My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2015
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\3550\PR0505827\COMPLIANCE INFO 2008-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
63/18/2015 02:13PM 6616349233 KERN CONSTRUCTION. PAGE 11/27 <br /> SWRCB,January 2002 • • <br /> Page t{ of� <br /> 6. UNDER-DISPENSER CONTAINMENT TESTING <br /> Test Method Developed By: U UDC Manufacturer x Industry Standard ❑Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: U Pressure O Vacuum x Hydrostatic <br /> U Other(Spec) <br /> Test Equipment Used:Incon is-sts Equipment Resolution:.001" <br /> UDC#1/2 UDC# UDC# UDC# <br /> UDC Manufacturer: Bravo <br /> UDC Material: Steel <br /> UDC De the 12" <br /> Height from UDC Bottom to Top 0" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 01, <br /> Lowest Electrical Penetration: AR 18 2015 <br /> Condition of UDC prior to Clean <br /> testing: ENV RON <br /> Portion of UDC Tested' 1/2 - eoeoT��r�ir <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both D Yes U No X NA U Yes D No O NA D Yes ❑No ❑NA ❑Yes ❑No DNA <br /> product and water ?* <br /> Turbine shutdown re onse time <br /> Is system programmed for fail- <br /> safe shutdown?' O Yes O No X NA D Yes O No DNA D Yes ONO DNA OYes DNo DNA <br /> Was fail-safe verified to be <br /> operational?* D Yes DNo X NA D Yes U No DNA Dyes DNo DNA C Yes O No DNA <br /> Wait time between applying 15 min. <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: 12:36 <br /> Initial Readin Rr : 0.419 <br /> Test End Time: 12:51 <br /> Final Readin (RF): 0.418 <br /> Test Duration: 15 Min <br /> Change in Reading(RF-& : 0.001 <br /> Pass/FailThreshold or Criteria: 0.002 <br /> Test Result: % Pass OrFail D Pas spm.DFail, 0 ❑Fail ❑,Pass ❑Fall '; <br /> Was sensor removed for testing? D Yes DNo X NA Oyes U No DNA OYes DNo O NA U Yes O No CNA <br /> =functional <br /> properly replaced and <br /> verifiedfunctionalafter testing? UYes 0 N XNA DYes DNo DNA OYes ON. DNA OYes DNo DNA <br /> Comments—(include information on repairs made prior to testing, and recommended fol/ow up forfailed tests) <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> Received Time Mar. 18. 2015 3: 16PM No- 8366 <br />
The URL can be used to link to this page
Your browser does not support the video tag.