Laserfiche WebLink
03/18/2015 02:13PM 6616349233 KERN CONSTRUCTION PAGE 12/27 <br /> SWRCB,January 2002 Page r of <br /> 7. PIPING SUMP TESTING <br /> Test Method Developed By: O Sump Manufacturer X Industry Standard O Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure ❑Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used:Incon is-sts Equipment Resolution:.001" <br /> Sump 987 Sump#Red DSL Sump# Sump# <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 48" 48" <br /> Sump Mawrial: FRP FRP <br /> Height from Tank Top to Top of 14" 14" <br /> Highest Piping Penetration: MAR 18 2015 <br /> Height from Tank Top to Lowest 24" 2811 <br /> Electrical Penetration: EM RONMENTAL <br /> Condition of sump prior to testing: good good 117A T?a^r0s9Ttrreit <br /> Portion of Sump Tested' 1/2 1/2 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes O No O NA X Yes O No 0 NA OYes O No DNA OYes O No O NA <br /> product and water)?* <br /> Turbine shutdown response time 3 see 3 sec. <br /> Is system programmed for fail-safe X Yes O No O NA X Yes 0 No O NA OYes O No O NA OYes O No 0 NA <br /> shutdown?* <br /> Was fail-safe verified to be X Yes O No DNA X Yes 0 No 0 NA OYes 0 No ❑NA OYes 0 No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 min. 15 min. <br /> test: <br /> Test Start Time: 11:07 10:35 <br /> Initial Reading(R): 6.083 4.970 <br /> Test End Time: 11:22 10:50 <br /> Final Reading(RF): 6.083 4.970 <br /> Test Duration: 15 min 15 min <br /> Change in Reading(RF-RO: 0.0 0.0 <br /> Pass/Fail Threshold or Criteria: -.002 -.002 <br /> Test Result: X Pass 0 Fail X Pass O Fail O Pass O Fall". O Pass ❑Fail <br /> Was sensor removed for testing? X Yes O No 0 NA X Yes O No [INA OYes 0 No DNA OYes O No DNA <br /> Was sensor properly replaced and X Yes 0 No 0 NA X Yes O No [INA 0 Yes ONO DNA 0 Yes 0 No 0 NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br /> Received Time Mar. 18. 2015 3: 16PM No. 8366 <br />