My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
11/8/2018 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM ' <br /> UNDERGROUND STORAGE TANK <br /> MIONTTORING PLAN-(Pee I oft <br /> TYPE OF ACTION 011 NEW PLAN 1 2.CHANGE OF INFORMATION <br /> 490.1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL UST,AT THIS FACILITY. <br /> (Check one item onl ) Ig 2.2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( 3- Rn7 <br /> FACILITY ID# L FACII4ITY INFORMATION <br /> (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 2Ct1 C:� e,m Q(n <br /> BUSINESS SITE ADDRESS IA, �t 5 S I v,1{� S� 103. CFFY i0.. <br /> ST oG�-Co <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive iPil3mll w1111 u and calibration ti monimring equipment(e.g.,sermrs,probes,line leek dettttors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and Nat such work must be <br /> 3 CCR 263 2634 2638,2641 Perfom3W by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED ® I.ANNUALLY ❑ 99.OTHERS ci 49044 <br /> 490.36 <br /> III.MONITORING LOCATIONS <br /> 12631.NEW SITE PLOT PLAN/MgP SUBMITTED WITHTH75 PLAN. 2.SRE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 4 4904 <br /> Iv TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> L CONTINUOUS ELECTRONC TANK MONITORING OF ANNULAR(INTERSTITL4,L)SFACE(S)OR SECONDARY CONTAINMENT 090.5 <br /> VAULTS)WITH AUDIBLE PND VISUAL ALARMS (23 CCR§2632,2634) <br /> SECONDARY COMA WMENT IS: a.DRY ❑ b.LIQUID Fn t Fn ❑ c.PRESSURIZED ❑d.UNDER VACUUM 4906 <br /> PANEL MANUFACTURER:V E Rco Cn lys7j +Cs 490'7. I MODEL#: 490. <br /> LEAK SENSOR MANUFACTURER:V F, _ ^C' <br /> V ° 1 MODEL#S: <br /> 4912.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKfc3 (23 CCR§2643) 490.11 <br /> PANEL MANUFACTURER: MODEL#: 49013 <br /> IN-TANK PROBE MANUFACTURER: <br /> MODEL#(S): 49015 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY(NIGHTLY9016 <br /> ❑ c.WEEKLY 4 <br /> e_OTHER(Spec�fyZ:_ 44W7PROGRAMMED TESTS_ ❑ a.0.11 ❑ b.02 gp.h. ❑ c OTHER(S -. -a9u-1c <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1):) 490�19 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR 62645). TESTING PERIOD: ❑ u 36 HOURS ❑ b.60 HOURS 49°'21 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 49x22 <br /> TEST FREQUENCY: ® a ANNUALLY ❑ b.BIENNIALLY490.23 <br /> ❑ c.OTHER(Specify).- 49024 <br /> ❑99.OTHER (Specify): 49026 <br /> 49036 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METRO S Check all that apply) 490.27 <br /> ®I.CONTINUOUS MONITORING OF Pll'E/PIPING SUMPS)PND OTHER SECONDARY CONTAINM"I WITH AUDIBLE AND 49028 <br /> VISUAL ALARMS (23 CCR§2636) <br /> SECONDARY CONTAINMENT LS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490.29 <br /> PANEL MANUFACTURER V r� Ro i.3�T 490')0 i MODEL#: - _'3S L• 490-31 <br /> L_ LEAK SENSOR MANUFACTURERV'l En R ��-,--� 49a3x MODEL#(SU 7 3 49x33 <br /> Ra.YES PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(1.t.,TURBINE)SHUTDOWN. <br /> 49034 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS ALTFOMATIC PUMP SHUTDOWN. J0.a.YES ❑b.NO <br /> ❑b.NO 490.35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 gp,b.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> � PRODUCT FLOW WHEN p LEAK IS DETECTED(23 CCR 62636) <br /> MLLD MANUFACTURER(S: 49032 49036 <br /> MODEL#(S): 49033 <br /> A 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 Ill LEAK TESTS (23 CCR§2636) 490.3y <br /> ELLD MANUFACTURER(S) 490'°0. MODEL#(S): lL;G) 49041 . <br /> PROGRAMMED INLINE LEAK TEST: ❑ I.MINIMUM MONTHLY 0.2 g.p.h ❑ 2.MINIMUM ANNUAL 0.1 49042 <br /> g.P.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. . 0 s YES ❑b.NO 40.13 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN, ®a.YES 49044 <br /> 4.PIPE INTEGRITY TESTING 49096 ❑b.NO <br /> TEST FRE UENCY a.ANNUALLY b.EVERY 3 YEARS C.OTHER(5 eci ) <br /> 5.VISUAL PIPE MONITORING. + + 42 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY i9" <br /> •nn4«wtorew4; or, AY _ __ ❑c.MIN.MONTHLY @ FACR TLS¢SYSTEM OPERATED• 490.49 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)J. <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.71S CONNECTED TO THE TANK SYSTEM 49a5o <br /> 490.31 <br /> ❑ 99.OTHER(Specify) <br /> 09062 <br /> 49653 <br /> UPCF UST-D(12/2007)1/4 MAR 16 2017 <br /> ENVIRONMENTAL HEALTH <br />
The URL can be used to link to this page
Your browser does not support the video tag.