My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
11/8/2018 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�A <br /> -� UNIFIED PROGRAM CONSOLIDATED FORM ' <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Page 1 of 2) <br /> TYPE OF ACTION 3 1 1.NEW PLAN IN 2.CHANGE OF INFORMATION 49 1 <br /> PLAN TYPE [ I.MONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. 490.2 <br /> (Check one item ord ) ® 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> TY $� <br /> L FACILITY INFORMATION <br /> FACILIID#(Agency Use Only, <br /> - - 1 <br /> BUSINESS NAME(Same as FACILITY NAME) SCh R C:J E�M M <br /> 3. <br /> BUSINESS S[TE ADDRESS 1'1�5s S ( l03 CITY tw <br /> HwAy S� STcG\�"C� <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenalrce,and calibration of monimfing equipment(ag,sensors,Probes,line Teak detectors,etc.)muri be performed at 01e frequency <br /> specified by the equipment m,,utachm,,,,instructions,or annually,whichever is more frequcnS and that such work must be rformed b <br /> 23 CCR 2632 2634 2638 2641 IN y qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(S 69'34 <br /> P°e ') <br /> III.MONITORING LOCATIONS 4WM <br /> 2fi34 L 904 NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN, 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING=THOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACES)OR SEARY CONTAINMENT a9's <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS, (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490.& <br /> PANEL MANUFACTURER V E R o GiLIi RCs 49'2. I MODEL#: -v 490-9 <br /> LEAK SENSOR MANUFACTURER MODEL#(S): 490.10 <br /> 1U 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGI E&ALL TANK(S) (23 CCR§2643) <br /> PANEL MANUFACTURER -{4, a90.1z. 490.11 <br /> MODEL#: 490.13 <br /> IN-TANK PROBE MANUFACTURER 414. MODEL#(S): 490.15 <br /> LEAK TEST FREQUENCY: ❑ &CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY ^9ai6 <br /> L---___ _- ❑ d MONTHLY _- -_ ❑ e.OTHER(S e�cify): 4WI7 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.02 g.p.h. ❑ C.OTHER(Specifyg ---_-_."--"wala <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49�0 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MIG)(23 CCR§2645). TESTING PERIOD: ❑ a 36 HOURS ❑ b.60 HOURS 490.21 <br /> i.TANK INTEGRITY TESTING(13 CCR§2643.1): 490.23 <br /> TEST FREQUENCY: ® a ANNUALLY 4Wn <br /> ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> 490.31 <br /> ❑99 OTHER (Specify): 490.26 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) 490.27 <br /> I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490.2a <br /> VISUAL ALARMS (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®%DRY ❑b LIQUID FILLED ❑c PRESSURIZED ❑d UNDER VACUUM 49029 <br /> PANEL MANUFACTURER V nE O Ru 490.30 iMODEL#: - 49'31 <br /> LEAK SENSOR MANUFACIURERVE� nfZ tZ�] 'C &90.32 - U <br /> MODEL#(S) '3 L 3 4WI3 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(I.e.,TURBINE)SHUTDONN. ®a YES 49'33 <br /> FAILURE/DLSCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a YES ❑b.NO <br /> 90.35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(11HLD)THAT ROUTINELY PERFORMS 3.0 g.pJL LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR 62636) <br /> MLLD MANUFACTURER(S). 49036 <br /> &90.37 MODEL#(S): 490.3e <br /> L SCI 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.L LEAK TESTS (23 CCR 62636) <br /> ELLD MANUFACTURERS) I I�,r) 05 1040. i <br /> MODEL#(S) J,6 ;oAc o 49041 <br /> PROGRAMMED IN LINE LEAK TEST. ❑ L MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.'INIMUM ANNUAL 0.1P.h4904- <br /> ELLD D1:TECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. 8. . 443 <br /> ELLD FAILURODISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN_ ®°'YES ❑b.NO 90. <br /> 55 a YES ❑b.NO 4% <br /> 4.PIPE INTEGRITY TESTING 490.4t <br /> TEST FRE UENCY a ANNUALLY b.EVERY YEARS c.OTHER(Specify) <br /> 5.VISUAL EEO <br /> 49646490.¢7 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TO45ESYSTEM 49o.re <br /> Nbwd@rmm�wia of mibumd fuel 315C 352x1. 3 OPERA7ID� 490.49 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(x)(3)). <br /> I.NO REGULATED PIPING PES90'f0 <br /> 49'51 D ' 0,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> ❑ 99.OTHER S <br /> ( PTY) y 490-32 <br /> 490.51 <br /> MAR 16 2017 <br /> UPCF UST-D(12/2007)114 _ <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.