Laserfiche WebLink
0 10 <br /> Revised Scope of Work SR#0071876 Arch Rd AMPM 4855 S. HWY 99 Stockton 10/28/15 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES[] NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the`Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Remove and replace 91 turbine relay. <br /> Remove(2) Red Jacket CPT Controllers on 87 Unleaded Tank. <br /> Install(2) new FE Petro Smart Controllers on the 87 Unleaded Tank. <br /> Install (2) new Vapodess Mechanical leak detectors on the(2)87 Unleaded turbines. <br /> Cold Start Veeder-Root System due to power outage. Perform V/R functionality test. <br /> OCT ? O <br /> "t�Fi�11V iu1 rm 1�1T�t l <br /> HEAI_TP nC:DA MTu r• - <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> 1.Type H-Relay <br /> 2. FE Petro STP-SCI Single Phase Controller <br /> 2. Vaporless 99 LD2000 Mechanical Line Leak Detector <br /> 3 <br />