Laserfiche WebLink
Terry Masters �C 1 � K i' A-VI TVV <br /> Scope of Work. <br /> Replace defective F.E.Petra Smart Controller board.Program Smart Controller,Monitored the sequence of operation <br /> to assure the correctfunctionality, <br /> Leak Detector will remain In 87 Turbine#1. <br /> Turbine#2 does not need Leak Detector as it assists Turbine#1 during slow delivery periods due to the volume being <br /> dispensed. <br /> Leak Detector in Turbine#1 monitors for line leak. Turbine#2 will not activate prior to Turbine#1 being activated. <br /> RECE N Eu <br /> FEB 112016 <br /> ENVVIFIONMA NE AL <br /> 1 <br />