My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO 2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:54:23 PM
Creation date
11/8/2018 9:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\NAVY\3515\PR0231210\COMPLIANCE INFO 2006-2015.PDF
QuestysFileName
COMPLIANCE INFO 2006-2015
QuestysRecordDate
8/4/2017 7:52:05 PM
QuestysRecordID
3555178
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: F Piping Manufacturer F Industry Standard r— Professional Engineer <br /> r Other(Specify) <br /> Test Method Used: F Pressure r Vacuum r Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used: d" Dial Gauge Equipment Resolution: .2 <br /> Piping Run Piping Run Piping Run Piping Run <br /> Line#1 Lne#2 <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: AO Smith AO Smith <br /> Piping Diameter: 6.00" 6.00" <br /> Length of Piping Run: 80 Feet 12 Feet <br /> Product Stored: Contact Water Contact Water <br /> Method and location of piping-run <br /> isolation: Test Boot Test Boot <br /> Wait time between applying <br /> pressure/vacuum/waterand 15 Min. 15 Min. <br /> starting test: <br /> Test Stan Time: 1:01 PM 1:01 PM <br /> Initial Reading(Rt): 5 PSI 5 PSI <br /> Test End Time: 2:01 PM 2:01 PM <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: I Hour I Hour <br /> Change in Reading(AFRI): 0 0 <br /> Pass/Fail Threshold orCriteria: 0 0 <br /> Test Result: r Pass r Fail r Pass r Fail F Pass r Fail F Pass F Fail <br /> Comments —(include information on repairs made prior to testing, and recommendedfolloir-up for failed tests) <br /> Replaced test boots in UST Tank Sump and Sump#2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.