Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: F Piping Manufacturer F Industry Standard r— Professional Engineer <br /> r Other(Specify) <br /> Test Method Used: F Pressure r Vacuum r Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used: d" Dial Gauge Equipment Resolution: .2 <br /> Piping Run Piping Run Piping Run Piping Run <br /> Line#1 Lne#2 <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: AO Smith AO Smith <br /> Piping Diameter: 6.00" 6.00" <br /> Length of Piping Run: 80 Feet 12 Feet <br /> Product Stored: Contact Water Contact Water <br /> Method and location of piping-run <br /> isolation: Test Boot Test Boot <br /> Wait time between applying <br /> pressure/vacuum/waterand 15 Min. 15 Min. <br /> starting test: <br /> Test Stan Time: 1:01 PM 1:01 PM <br /> Initial Reading(Rt): 5 PSI 5 PSI <br /> Test End Time: 2:01 PM 2:01 PM <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: I Hour I Hour <br /> Change in Reading(AFRI): 0 0 <br /> Pass/Fail Threshold orCriteria: 0 0 <br /> Test Result: r Pass r Fail r Pass r Fail F Pass r Fail F Pass F Fail <br /> Comments —(include information on repairs made prior to testing, and recommendedfolloir-up for failed tests) <br /> Replaced test boots in UST Tank Sump and Sump#2. <br />