My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO 2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:54:23 PM
Creation date
11/8/2018 9:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\NAVY\3515\PR0231210\COMPLIANCE INFO 2006-2015.PDF
QuestysFileName
COMPLIANCE INFO 2006-2015
QuestysRecordDate
8/4/2017 7:52:05 PM
QuestysRecordID
3555178
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.PIPING SUMP TESTING <br /> Test Method Developed By: r Sump Manufacturer F Industry Standard r Professional Engineer <br /> F Other(Specify) <br /> Test Method Used: r Pressure r vacuum r Hydrostatic <br /> F Other(Specify) <br /> Test Equipment Used: InconTS-STS 1(quipmcnt licsnlutinn: .[1(106 <br /> ump Sump Sump Sump <br /> Smrp H2(iar�k) <br /> Sump Diameter: 42.00" <br /> Sump Depth: 48.00" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 42.00" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 40.00" <br /> Electrical Penetration: <br /> Condition of sump priorto Good <br /> testing : <br /> Portion of Sump Tested(1) 2" Above Piping <br /> Does turbine shutdown when r r r r r� r r r r'� r r r <br /> sump sensor detects liquid(both I Y«I No I- NA I Ya I No 1 NA I Yu I No I NA I Ya I No I NA <br /> product and water)?* <br /> Turbine shutdown response time N/A <br /> Is system programmed for fai I- r Y.r No r NA r Y«r r r Fr— r r F <br /> safe shutdown?* r— r r Ir No Ir NA I Ya 1 No r� NA Ir Yes IIS No Ir NA <br /> Was faro-safe Verified IO be r Yu 1 No P NA I Ya 1 No I NA r Yes 1 No 1 NA 1 Ya 1 No 1 NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Min. <br /> stani ng test: <br /> Test Star[Time: 11:43 AM 1:05 PM <br /> Initial Reading(Rl): 7.1671 7.1670 <br /> 'fest End Time: 11:58 AM 1:20 PM <br /> Final Reading(RF): 7.1670 7.1669 <br /> Test Duration: 15 Min. 15 Min. <br /> Change in Reading(RrRl): .0001 .0001 <br /> Pass/Fail Threshold or Criteria: .002 1.002 <br /> Test Result: rr Pass r Fail rr Pass r Frail rr Pass r Fail rr Pass r Fail <br /> Was sensor removed for testing? I_ Y«FN. <br /> No rF NA Ir Ya r— No Ir NA Ir Yes Ir--' No rF NA Ir Yc rr No rr NA <br /> Was sensor properly replaced and r Y.I- No 1 NA I Ya I No I NA 1 Yes 1 No I NA 1 Y.I No 1 NA <br /> veri5ed functional after testing'? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Sensor was removed during testing,replaced at lowest point in sump but not tested. <br /> (1)If the entire depth of the sump is not tested, specify how much was tested. Ifthe answer to any of the questions indicated <br /> with an asterisk(*) is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.