My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO 2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:54:23 PM
Creation date
11/8/2018 9:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\NAVY\3515\PR0231210\COMPLIANCE INFO 2006-2015.PDF
QuestysFileName
COMPLIANCE INFO 2006-2015
QuestysRecordDate
8/4/2017 7:52:05 PM
QuestysRecordID
3555178
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WWSWRCB,January 2002 l Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer hidustry Standard X Professional Engineer <br /> Other(Specii,6) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> Test EquipmeptIIsed: Caldwell Systems Equipment Resolution: .005/30 min <br /> Sump# 1 Sump#2 Sump# Sump <br /> Sump Diameter: 48" 42" <br /> Sump Depth: 36" 48" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank,Top to Top of 22„ 42" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 6„ 40" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No x NA Yes No x NA Yes No NA Yes No NA <br /> product and water)?' <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe yes No x NA Yes No x NA Yes No NA Yes No NA <br /> shutdown?' <br /> Was fail-safe verified to be Yes x No NA Yes x No NA Yes No NA Yes No NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 11:55 <br /> Initial Reading(Ri): .00" .00" .00" .00" <br /> Test End Time: 12:25 <br /> Final Reading(RF): .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-Rt): 00 <br /> Pass/Fail Threshold or Criteria: .005/30 min 005/30 min .005/30 min .005/30 min <br /> Test Result: x Pass 0 Fail 0 Pass x Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> Was sensor removed for testing? x Yes No NA x Yes No NA x Yes No NA Yes No NA <br /> Was sensor properly replaced and x Yes No NA x Yes No NA x Yes No NA Yes No NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Unable to test sump 2 at the load rack torn penetration fittings and test reducers. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO" or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.