Laserfiche WebLink
SWRCB,January 2002 I'aee _ of_ <br /> S. SECONDARY PIPE TESTING <br /> FTestethod Developed By: X Piping Manufacturer Industry Standard Professional Engineer <br /> Other(Specify) <br /> ethod Used: X Pressure Vacuum Hydrostatic <br /> Other(Specifj) <br /> E ui mentResoluhon: 0-15 PSI <br /> 1-.qugnnent Used Pressure Oaune 9 P <br /> rr= <br /> Run#2 Piping Run# Piping Run# <br /> Pipine Material: ss <br /> Piping Manufacturer: <br /> Piping Diameter: _ _ _- __Length of Piping Run: <br /> Product Stored: Contact Water Contact Water - <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rr): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: 1 Hour I Hour UlHourlHour <br /> Change in Reading(RF-Rr): 0Pass/Fail Threshold or 0 drop 0 drop p <br /> Criteria: _-test Result: Pass x Fail ❑ Pass FFail Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> Unable to test either pipe. Boots are torn, need 6.5 x 4.5 reducer boots with air test <br />