Laserfiche WebLink
SWRCB,January 2002 • • Page_of_ <br /> 5. SECONDARY P1PE TESTING <br /> Test Method Developed By: X Piping Manufacturer 17 Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> Piping Run# 1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 6" 6" <br /> Length of Piping Run: 75' 6' <br /> Product Stored: Slop tank Slop tank <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 9:10 9:00 <br /> Initial Reading(Rj): 5 PSI 5 PSI <br /> Test End Time: 10:10 10:00 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: I Hour 1 Hour 30 min 30 min <br /> Change in Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: x Pass ❑Fail x Pass ❑Fail l7 Pass ❑Fail ❑ Pass 11 Fail <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />