My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO 2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:54:23 PM
Creation date
11/8/2018 9:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\NAVY\3515\PR0231210\COMPLIANCE INFO 2006-2015.PDF
QuestysFileName
COMPLIANCE INFO 2006-2015
QuestysRecordDate
8/4/2017 7:52:05 PM
QuestysRecordID
3555178
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R1 G <br /> SWRCB,January 2002 OCT 20 24.015 <br /> 5. SECONDARY PIPE TESTING 1)11 ML <br /> Test Method Developed By: ❑Piping Manufacturer ❑Industry Standard ❑P ,Tu nFppgTAAFNT <br /> [3 Other(Specify) HFA. <br /> Test Method Used: 0 Pressure ❑vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Fquipment Cscd 4 Dial Guage Equipment Resolution 2 <br /> ----------------- <br /> Line Secondary#1 Line Secondary#2 <br /> r Piping Material _ _ •Fiberglass Fiberglass ._ <br /> Piping Manufacturer: AO Smith AO Smith _ <br /> Piping Diameter: 6" 6" <br /> Length of Piping Run: Approx.80' Approx. 12' <br /> Product Stored: Waster Water Waste Water <br /> Method and location of Test Boots Test Boots <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. 15 min. <br /> starting test: <br /> Test Start Time: 11:00 am 11:00 am <br /> Initial Reading(R,): 5 psi 5 psi <br /> Test End Time: 12:00 pm 12:00 pm <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result: ❑X Pass []Fail 21 Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments (include information on repairs made prior to testin and recommendedfollow-upfor,failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.