My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO 2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:54:23 PM
Creation date
11/8/2018 9:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\NAVY\3515\PR0231210\COMPLIANCE INFO 2006-2015.PDF
QuestysFileName
COMPLIANCE INFO 2006-2015
QuestysRecordDate
8/4/2017 7:52:05 PM
QuestysRecordID
3555178
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s • 6 VE <br /> SWRCB,January 2002 OCT 2 0 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer X❑Industry Standard ❑PEWIRONMEWAL <br /> ❑Other(Spec) HEAvTH nc04RT14aKIT <br /> Test Method Used: ❑Pressure ❑VacuumX❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Incon TS-STS Equipment Resolution: .0006 <br /> Slop Tank Lane 3 Sump <br /> Sump Diameter: 48" 42" <br /> Sump Depth: 66" 48" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 22" 42„ <br /> Hi hest Piping Penetration: <br /> Height from Tank Top to Lowest 6" 40" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Poor Good <br /> Portion of Sump Tested' NA 2"above high pen. <br /> Does turbine shut down when ❑Yes ❑No X❑NA <br /> sump sensor detects liquid(both ❑Yes❑No[ZINA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> product and waterp. <br /> Turbine shutdown response time NA NA <br /> Is system programmed for fail-safe [I]Yes ❑No [Z]NA ❑Yes❑No EINA Dyes❑No❑NA ❑Yes❑No❑NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑Yes []No [HINA ❑Yes❑No[ONA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting NA 15 min. <br /> test: <br /> Test Start Time: NA 12:42 pm 12:57 pm <br /> Initial Reading(R,): NA 4.3962 4.3962 <br /> Test End Time: NA 12:57 pm 1:12 m <br /> Final Reading(Rr): NA 4.3962 4.3962 <br /> Test Duration: NA 15 min. 15 min. <br /> Changein Reading(Rr-R,): NA .0000 .0000 <br /> Pass/Fail Threshold or Criteria: .002 1 .002 .002 <br /> Test Result: ❑ Pass ❑X Fail ❑X Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Was sensor removed for testing? (E]Yes [—]No ❑NA ❑X Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> Was sensor properly replaced and ❑X Yes ❑No ❑NA E]Yes ❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> verified functional after testing? <br /> Comments— (inchide information on repairs made prior to testing and recommendedfollou,-upforfailed tests) <br /> The sensors were tested during the monitoring certification, and then reinstalled to the lowest point. <br /> Due to cracked sump penetrations,the slop tank sump was not tested.Visual Failure. <br /> ' If the entire depth of the sump is not tested,specify how much was tested. if the answer to any of the questions indicated with an <br /> asterisk(")is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.