Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: <br /> r Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section mustbe completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the follow ing checklist: -------- <br /> 1'es F- No* Has all input or ring been inspected forproper entry and termination,including testing for ground faults? - <br /> 1-cs F No* lyeie all tank gauging probe, sisuall} in,pccted lot damageand le,idLie hulldup' <br /> .„-::.:u .x �3..;: �. ..u:uw,rcaioov�ww�rs• <br /> Yes No'R \\as accuracy of „stein product Ic%el reading: leafed? <br /> Yc (• NO Was accuse} ofsystein water level readings tested'Z <br /> F— Yes F No* Were all probe,rem tallccl properly' <br /> Ye; N'a, welc all item,on the equpment manufacteuci s maintenance checklist completed? <br /> ,in the Section[[,below,describe how and when these deficiencies were or will he corrected <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> F Yes a r No* _'For equipment start-up or annual equipment certification, was a leak simulated to ver fy LLD performance?(Check <br /> r N/A all that apply) Simulated leak rate: r 3gph; F Otgph r 02gp.h <br /> F Yes r No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> F Yes r No* Was the testing apparatus properly calibrated <br /> jr Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> F N/A <br /> r Yes r No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> F N/A <br /> FrYes r No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> F N/A disconnected? <br /> ' r Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A fails a test? <br /> F Yes r No* Forelectronic LLDs,have all accessiblewiring connectionsbeen visually inspected? <br /> F N/A <br /> F Yes r No*. Were all items on the equipment <br /> mamtfacturer's maintenance checklist completed? <br /> *Inthe Section tl.below,desertbehow and when these deficiencies were or will becorreeted <br /> IT. Comments: <br /> Suction System. <br /> OCT 3 0 2us�4 <br /> ENVIRONMENTAL HEATH <br /> PERMIT/CFRI/If;rP <br />