Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: "'" <br /> Lj <br /> F Check this box i ftank gauging is used only for inventory coOOkcl.nttrrro7l. <br /> F Check this box if no tank gauging or SIR equipment is inst2P1 G 2014 <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> ENVIRONMENTAL HEALTH <br /> Com Iete the following checklist: DEPARTMENT <br /> -- <br /> r Yes r No* Has all input wiling been inspected for properenny and termination,including testing for ground faults? <br /> F Yes r No* Were all tank gauging probes visually inspected for damage and residue buildup'? <br /> 1' (— Yes r No* Was accuracy of system product level readings tested? -- <br /> (— Yes (— No* Was accuracy of system water level readings tested'? <br /> ysx <br /> r Yes ;. r No Were all probes reinstalled properly? <br /> Yes r No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe howand when these deficiencies were or will be corrected, - -G.Line Leak Detectors(LLD): r Check this box if LLDs arenot installed. <br /> Complete the following checklist: <br /> r Yes r No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?( <br /> Check <br /> fy performance. Check <br /> r N/A al/thatapply) Simulated leak rate: r 3gp.h.; r 0.1gph; r 02g.p.h. <br /> r Yes r No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> r Yes r No* Was the testing apparatus properly calibrated? <br /> r Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> r N/A <br /> r Yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> F N/A <br /> r Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> F N/A disconnected? <br /> r Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> F N/A fails a test? <br /> F Yes r No* Forelectrunic LLDs,have all accessible wiring connections been visually inspected? <br /> F N/A <br /> r Yes r No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,dmerisehow and when these deficiencies were or will becorreetea — <br /> H. Comments: <br /> Suction System. <br />