My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:23:56 PM
Creation date
11/8/2018 9:51:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PERSHING\4501\PR0231233\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
7/17/2018 6:27:41 PM
QuestysRecordID
3176678
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • RECEIVED <br /> D.Results of Testing/Servicing O C T U 4 2017 <br /> Software Version Installed: 333.03 <br /> Complete the following checklist: ENVIRONMENTAL HEALTH <br /> Yes r No* Is the audible alar operational? <br /> Yes r No* Is the visual alar operational? <br /> Yes r No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes r No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br /> heir proper operation? <br /> Yes r No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> N/A <br /> Yes No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> N/A em detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> al/Mat apply)r Sump/Trench Sensors; r Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection?r Yes; r No <br /> Yes r No* For tank systems that utilize the monitoring system as the primary tank overall warning device(i.e.no mechanical overfill <br /> r N/A Prevention valve is installed),is the overfill warning alar visible and audible at the tank fill point(s)and operating properly?If <br /> at what percent of tank capacity does the alarm trigger?% <br /> Yes* r No Nas any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E below. <br /> Yes* r No as liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) <br /> Product; r Water.If 's, <br /> s describe causes in Section E below. <br /> Ir Yes r No* as monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Ir Yes r No* s all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E.Comments; <br /> JUST CHECKED IF THE SENSORS IN THE LOWEST POINT AND ALSO FREE OF LIQUID AND TRASH... <br /> Monitoring System Certification Page 2 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.