Laserfiche WebLink
• • RECEIVED <br /> OCT 0 4 2017 <br /> F.In-Tank Gauging/SIR Equipment: r Check this box if tank gauging is used only for inventory control. <br /> F Check this box if no tank gaugi0apr �`Wp� t'H EALf 1H <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. CC�i vv DEPARTMENT <br /> Complete the following checklist: <br /> Yes No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes "- No* Nere all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes No* Nas accuracy of system product level readings tested? <br /> Yes No* Nas accuracy of system water level readings tested? <br /> Yes No* Nere all probes reinstalled properly? <br /> Yes No* Nere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes — No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> — N/A apply)Simulated leak rate:r 3 g.p.h.; r 0.1 g.p.h; 1 0.2 g.p.h. <br /> Yes (' No* Nere all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes (' No* Nas the testing apparatus properly calibrated? <br /> Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> • Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A onitoring system is disabled or disconnected? <br /> • Yes r No* or electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A onitoring system malfunctions or fails a test? <br /> • Yes r No* or electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes r No* Nere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />