Laserfiche WebLink
A5. Burial Depth and Cover A6. Filter Fabrtr Wet Hole Liner <br /> The tank hole must be deep enough to allow a minimum of 12'required It is the responsibility of the tank owner or his technical representativeto <br /> backfill bed over the hole bottom or concrete slab. determine if filter fabric is appropriate for a specific tank installation.Our <br /> experience indicates that if all the other installation instructions are <br /> If the total burial depth from tank top is greater than 60%of the tank carefully followed,the use of filter fabric is not essential. <br /> diameter,anchoring the tank is not required.(See Section A9 for details.) fff'''..��� <br /> Filterfabric preveMsthe migration of pea gravel with native sill;it helpsto <br /> PAD DIMENSIONS maintain the integrity and stability of the backfill material.O/C Tanks <br /> �► i .--F-12^ am Paving must extend at least 12" recommends the use of filter fabric for the following types of installations: <br /> , . - ._. <br /> .f - -: beyond tank outline in all 1.Tidal conditions or areas subjected to frequently changing ground - <br /> Y : ` directions. water levels. <br /> 7 max ! - <br /> - : .. ._ MAXIMUM BURIAL DEPTH(ALL 2.Unstable Bolls(muck or landfills) <br /> SIZE TANKS) 3.Water conditions with silty soil <br /> ... To comply with Ulrequirements, Suitable brand name filter fabrics are itemized below.Local fitter fabric <br /> depth of cover fortanks in both distributors can be identified by calling the phone numbers listed. <br /> 'r traffic and no traffic conditions <br /> must not exceed 7'over tank top. Manufacturer Reemay,Inc. <br /> - For double-wall tanks,ifacen- Product TYPAR3401 orTYPAR3341 <br /> ......- ?.... .. ......... : tinuous vacuum monitor is used, <br /> Phone (800)321-6271 <br /> the maximum burial depth is 3 feet Manufacturer Hoechst Celanese Corporation <br /> from the tank top to grade. Product TREVIRA S1120(hole depth less than l0'deep) <br /> For deeper burial de ths,contact the Fiber las Tank Installation T 00)845EVIRA 7597 (hole depth greater than l0'deep) <br /> P 9 Phone (800)845-7597 <br /> Manager. <br /> Manufacturer Phillips Fibers <br /> slope determined by No Traffic Loads Product SUPAC4NP <br /> :pe determstabine (550-20,000 gallon models) Phone (800)845-5737 <br /> ty <br /> Tanks not subjected totraffic loads Polyethylene is not considered an effective material to prevent migration <br /> need a minimum cover of 24" of pea gravel and native soil;4 tears and will degrade in a wet hole <br /> backfill;or l2"plus 4"reinforced environment. <br /> ztias ' 24" <br /> backfill concrete.Consult local codes for Installation Procedure:Line the excavation sides and bottom with fitter <br /> minimum allowable burial dept h. fabric.Overlap adjoining fabric panels at least 12inches.Placesome <br /> 12•backfill <br /> backfill on top of the filter fabric in and around the excavation perimeter to <br /> 4•reinforced hold the fabric in place. <br /> concrete In wet hole installations,backfill ballast is necessary to sink and hold the <br /> i filter fabric to the bottom of the excavation. <br /> A7. Installation Procedure—Dry Hole <br /> .� MINIMUM BURIAL DEPTH Bed <br /> Traffic Loads Provide a minimum of l2"levels roved backfill bed see Section A2 <br /> (550-20,000 gallon models) PP ( ) � - <br /> - Tanks subjected to traffic loads over hole bottom or concrete slab.Set tanks on bed. <br /> must have a cover depth of 36" DO NOT PLACE TANKS DIRECTLY ON CONCRETE SLAB.TIMBERS, <br /> BEAMS OR CRADLES. <br /> a5^Dk. backfill or 18'minimum backfill <br /> plus 6"of reinforced concrete. DO NOT MIX APPROVED GRAVEL WITH SAND OR NATIVE SOIL. <br /> la•bid. The reinforcements in the concrete Always use approved gravel.Do not backfill in layers using sand or native <br /> .s•rom. pad must be properly sized for the sill.Regardless of the hole size,all excavated(or loose)native soil <br /> ronceta job conditions to assure concrete must be replaced with approved bacMill material. <br /> surface pad integrity. <br /> Backfilling <br /> --`� longe oled (550.48,000 gallon models) <br /> Note:TANKS INSTALLED WITH <br /> No Traffic Loads BACKFILL TO TOP OF TANK, <br /> (25,00048,000 gallon models) BUT WITHOUT BACKFILL TO <br /> Tanks not subject to traffic loads First GRADESHOULDBECOM- <br /> need aminimum cover <br /> of42" 12•lift of PLETELY FILLEDWITHWATER <br /> backfill;or 38"backfill plus 4"rein- backfill i OR PRODUCT AS BALLAST.DO <br /> 12 <br /> forced concrete. <br /> NOT PLACE WATER OR PRO- <br /> DUCT IN TANK UNTIL BACKFILL <br /> ISEVENWITHTANK TO P. <br /> voids A <br /> +4 /2 bed <br /> ft's Mtical that this area offer full <br /> support undertankand end caps. <br /> Traffic Loads <br /> (25,00048,000 gallon models) <br /> ... ... Tanks subjected to traffic loads <br /> must have cover depth of 38" <br /> backfill,plus 6"of asphaft,or 6"of Fist <br /> ag pM re-bar reinforced concrete. 12^lin or <br /> +6" backfill <br /> asphait <br /> a <br /> \. wnorate <br /> 'r Ifs critical that this area offer fu 11 <br /> support under tank and end caps. <br /> 4 <br />